[Sis-ams] Green Book/Test Plan & Possible Spec Correction
Scott Burleigh
Scott.Burleigh at jpl.nasa.gov
Thu Oct 9 11:32:11 EDT 2008
Edell, David J. wrote:
> All,
>
> My draft of an interoperability test plan is now on the CWE
> (uploaded by Scott), building on Tim and Pat's drafts. It adds
> details and tables for recording the results. RAMS testing and
> multiple configuration servers are the only sections currently
> missing. I think the multiple iterations listed should cover most
> useful permutations of the main AMS functionality, though I'm sure
> there's room for improvement.
>
> I'm cleaning up my Green Book draft/outline, which I'll likely send
> out soon. In the process, I found a few small items in the spec,
> listed below, but which we can always discuss in Berlin next week.
>
> I think I found a small discrepancy in the spec, section 2.3.5. It
> states "[the node] re-queries the configuration server to determine
> the new network location of the registrar and resumes exchanging
> heartbeats." This doesn't reflect the fact that the node also needs
> to issue a 'reconnect' first. I think it should be changed to
> something like: "...and continues with the reconnection procedures
> prior to resuming heartbeat exchange."
Good point, David. We can discuss at the meeting, and I want to take a
minute to review the text first, but I think you are right.
> Organizationally in the Red Book, I think the "Conformance Classes"
> and the new "Service conformance Statement" chapters should be
> consecutive, ie: swap chapters 7 and 8. It doesn't necessarily
> matter, but the MIB chapter simply seems misplaced stuck in between
> the two conformance sections.
That makes sense, but let's discuss at the meeting.
Scott
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.ccsds.org/pipermail/sis-ams/attachments/20081009/5f7c2d31/attachment.htm
More information about the Sis-ams
mailing list