Hi Marcin,

I’ve been out of touch for awhile too. Regarding AI 2016-1017-5 Add PIF test case for space-based aperture, I believe that you and I addressed this action at the Rome meeting by adding it to the list that we will test in Section 2.4.2.2. Phase 2 Description. It reads:

Use cases may include mission design, planning and operational scenarios and shall include:


  *   Small vs. large number of events;
  *   Specific time frame;
  *   Deep Space, LEO, GEO, and Space-based aperture events;

·         Mandatory and optional parameters to demonstrate extensibility

However we did not specifically add it to the Test Run Summary table for Phase 2 so maybe we need to add that to make sure we cover this test case.  Please take a look at this section and see what you think.

Kind regards,
Karen
--
Karen L. Tuttle
NASA Glenn ISS Payload Operations Center, Project & Integration Manager
216 433-5297 (Office)
216 308-6922 (Work Cell)


From: "Marcin.Gnat at dlr.de" <Marcin.Gnat at dlr.de>
Date: Wednesday, February 1, 2017 at 11:20 AM
To: "Tuttle, Karen L. (GRC-MSI0)" <karen.l.tuttle at nasa.gov>, "smwg at mailman.ccsds.org" <smwg at mailman.ccsds.org>
Subject: AI2016-1021-19 and RE: CSSM Action Items due by next Telecon

Dear Karen and all,

First, sorry for my absence last times, and being silent, but you know how it is… CCSDS stuff does not get highest priority…
But I’m there and I did not forget (well… almost….).

Anyhow here some heads up from me.

I created small presentation for the AI2016-1921-19 which is located at CWE:
http://cwe.ccsds.org/css/docs/CSS-SM/CWE%20Private/Planning%20and%20Service%20Request%20Book/Prototyping/AI2016-1021-19_SMURF_Test_Cases.pptx

We can discuss that at next telecom, which I plan currently to attend.

Regarding 2016-1017-5  Add PIF test case for space-based aperature, I must admit I lost the track, so I do not know what to do there. Can someone help me out?

Regarding 2016-0405-1  Review the Concept Book for Service Agreement and Configuration Profile extensibility and check for consistency with the current concepts… Yes… Following:

-          I looked at the latest version John friendly uploaded to CWE. It’s big.

-          I’m not sure yet if I have the complete picture of the book itself, not even thinking about relation to latest developments (btw. are there any additional things happened since mid last year?). Anyway, I need here to gather stuff a bit (i.e. look into minutes of our Fall Meeting in Rome). Luckily John wrote up some introductory part which should help to continue / rework. I’m going to read and analyze that in depth, and…

-          … I’m going to contact John directly in some days and maybe he can help me out, or at least let me help to find the starting point.

-          During San Antonio meetings I’m going to visit Boot Camp.

Best Regards
Marcin


From: SMWG [mailto:smwg-bounces at mailman.ccsds.org] On Behalf Of Tuttle, Karen L. (GRC-MSI0)
Sent: Dienstag, 31. Januar 2017 20:37
To: smwg at mailman.ccsds.org
Subject: [Smwg] CSSM Action Items due by next Telecon

Dear CSSM Colleagues,

The action item list has been updated from the last telecon. The list is attached and has been uploaded onto the CWE. The following actions are due on or before our next telecon on 15 Feb.


AI#

Action

Assignee

Due Date

2016-0405-1

Review the Concept Book for Service Agreement and Configuration Profile extensibility and check for consistency with the current concepts

MG

30-Dec-16

2016-1019-8

Review Service Catalog draft and provide comments

JPC

15-Jan-17

2016-1017-5

Add PIF test case for space-based aperature

MG, KT, JPC

30-Jan-17

2016-1021-15

Produce diagram capturing the conclusions developed with the CSTS concerning the CSS control architecture

EB

30-Jan-17

2016-1018-6

Update PIF XML Schema

HD, CH

31-Jan-17

2016-1021-19

Produce outline of SMURF Test cases/plan

EB, KT, MG

10-Feb-17

2016-1017-4

Check the Planning Event terminology with the CCSDS catalog

CH

15-Feb-17

2016-1020-12

Add the Event Definition and Parameter Definition to the Common Class tab in the inter-recommendation spreadsheet

KT

15-Feb-17

2016-1020-14

Develop examples showing DDOR parameters, config profiles, planning requests and service package requests

EB

15-Feb-17


Regards,
Karen
--
Karen L. Tuttle
NASA Glenn ISS Payload Operations Center, Project & Integration Manager
216 433-5297 (Office)
216 308-6922 (Work Cell)

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/smwg/attachments/20170217/9fb4a476/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: SPF-YB-902 2-Y-05-TP 10-17-16.docx
Type: application/vnd.openxmlformats-officedocument.wordprocessingml.document
Size: 214227 bytes
Desc: SPF-YB-902 2-Y-05-TP 10-17-16.docx
URL: <http://mailman.ccsds.org/pipermail/smwg/attachments/20170217/9fb4a476/attachment.docx>


More information about the SMWG mailing list