[CMC] CESG Interpretation of the MOIMS PS WG
Nestor.Peccia at esa.int
Nestor.Peccia at esa.int
Fri Oct 9 12:32:16 UTC 2015
Dear CMC members,
After the Summer saga on the creation of the PS WG and considering the
closed CESG / CMC polls (see conditions below) and the still open poll to
nominate PS WG Chairs, my interpretation of the situation is as follows
the creation of the WG has been approved. CESG conditions on the focus has
been solved.
only the GB Project has been approved
the BB Project will be left as Draft Project, and once the GB is complete
a CMC Project approval poll will be issued. This is in line with
conditions from CNES and ESA
we do not have today WG Chairs. The current poll (closing on 12th oct) has
conditions and some ADs did not cast the vote yet.
Ì would like to ask the CMC for a consolidated opinion on this situation.
ciao
nestor
==========================================
--------------------------------------------------------------------------------
CESG-P-2015-04-001 Creation the MOIMS Mission Planning and Scheduling WG
SEA AD Shames Peter
APPROVE WITH CONDITIONS (state conditions that must be satisfied) I have
two concerns about this WG, as stated in the charter and white paper:
1) The focus in most of these materials seems to be on SM&C and how it can
solve the problem, rather than on Mission Planning and a clear
presentation of what they need. This is both "cart before the horse" and
looks like an overly tight binding that may be detrimental to the overall
usability of the resulting standards.
2) The WG leadership is exclusively Euro-centric. Since there does appear
to be a significant North American interest in this it would be sensible
to broaden the coverage to recognize that. 4/23/2015 11:38 AM
--------------------------------------------------------------------------------
CMC-P-2015-05-003 Creation the MOIMS Mission Planning and Scheduling WG
CNES Soula Jean-Marc
ADOPT PROVISIONALLY (i.e., if stated condition is satisfied) CNES
approves the creation of the WG and the GB project but, as the BB is
planned in 2018-2019, it is not possible to commit on resources such a
long time in advance.
Therefore, CNES supports ESA proposal for a Go/NoGo decision after
completion of the GB. 6/5/2015 12:17 PM
ESA Miro Juan
ADOPT PROVISIONALLY (i.e., if stated condition is satisfied) ESA confirms
its support to the creation of MOIMS Mission Planning and Scheduling
Working Group and will support with adequate resources the ESA role as WG
chair and member
ESA also authorizes the project for the production of the Mission Planning
and Scheduling Green Book and will deploy 2 WM for its production (1 in
2016 and 1 in 2017).
ESA proposes a checkpoint at completion of the GB for the CMC to approve
the project Mission Planning and Scheduling Blue Book and confirm the
resources required for its production 6/5/2015 7:42 AM
This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/cmc/attachments/20151009/af8c05db/attachment.html>
More information about the CMC
mailing list