<font size=2 face="sans-serif">Dear CMC members,</font>
<br>
<br><font size=2 face="sans-serif">After the Summer saga on the creation
of the PS WG and considering the closed CESG / CMC polls (see conditions
below) and the still open poll to nominate PS WG Chairs, my interpretation
of the situation is as follows</font>
<br>
<ul>
<li><font size=2 face="sans-serif">the creation of the WG has been approved.
CESG conditions on the focus has been solved.</font>
<li><font size=2 face="sans-serif">only the GB Project has been approved</font>
<li><font size=2 face="sans-serif">the BB Project will be left as Draft
Project, and once the GB is complete a CMC Project approval poll will be
issued. This is in line with conditions from CNES and ESA</font>
<li><font size=2 face="sans-serif">we do not have today WG Chairs. The
current poll (closing on 12th oct) has conditions and some ADs did not
cast the vote yet.</font></ul>
<br><font size=2 face="sans-serif">Ì would like to ask the CMC for a consolidated
opinion on this situation.</font>
<br>
<br><font size=2 face="sans-serif">ciao</font>
<br><font size=2 face="sans-serif">nestor</font>
<br>
<br><font size=2 face="sans-serif">==========================================</font>
<br>
<br>
<br><font size=2 face="sans-serif">--------------------------------------------------------------------------------</font>
<br><font size=2 face="sans-serif">CESG-P-2015-04-001 Creation the MOIMS
Mission Planning and Scheduling WG</font>
<br><font size=2 face="sans-serif">SEA AD  Shames Peter </font>
<br><font size=2 face="sans-serif"> APPROVE WITH CONDITIONS (state
conditions that must be satisfied) I have two concerns about this WG, as
stated in the charter and white paper: </font>
<br>
<br><font size=2 face="sans-serif">1) The focus in most of these materials
seems to be on SM&C and how it can solve the problem, rather than on
Mission Planning and a clear presentation of what they need.  This
is both "cart before the horse" and looks like an overly tight
binding that may be detrimental to the overall usability of the resulting
standards. </font>
<br>
<br><font size=2 face="sans-serif">2) The WG leadership is exclusively
Euro-centric.  Since there does appear to be a significant North American
interest in this it would be sensible to broaden the coverage to recognize
that. 4/23/2015 11:38 AM </font>
<br><font size=2 face="sans-serif">   </font>
<br><font size=2 face="sans-serif">--------------------------------------------------------------------------------</font>
<br><font size=2 face="sans-serif"> CMC-P-2015-05-003 Creation the
MOIMS Mission Planning and Scheduling WG</font>
<br>
<br><font size=2 face="sans-serif">CNES  Soula Jean-Marc </font>
<br><font size=2 face="sans-serif"> ADOPT PROVISIONALLY (i.e., if
stated condition is satisfied) CNES approves the creation of the WG and
the GB project but, as the BB is planned in 2018-2019, it is not possible
to commit on resources such a long time in advance. </font>
<br><font size=2 face="sans-serif">Therefore, CNES supports ESA proposal
for a Go/NoGo decision after completion of the GB. 6/5/2015 12:17 PM </font>
<br>
<br><font size=2 face="sans-serif">ESA  Miro Juan </font>
<br><font size=2 face="sans-serif"> ADOPT PROVISIONALLY (i.e., if
stated condition is satisfied) ESA confirms its support to the creation
of MOIMS Mission Planning and Scheduling Working Group and will support
with adequate resources the ESA role as WG chair and member </font>
<br>
<br><font size=2 face="sans-serif">ESA also authorizes the project for
the production of the Mission Planning and Scheduling Green Book and will
deploy 2 WM for its production (1 in 2016 and 1 in 2017). </font>
<br>
<br><font size=2 face="sans-serif">ESA proposes a checkpoint at completion
of the GB for the CMC to approve the project Mission Planning and Scheduling
Blue Book and confirm the resources required for its production 6/5/2015
7:42 AM </font>
<br><font size=2 face="sans-serif">   </font>
<br><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>