[Css-csts] "monitoring parameters" in Cyclic Report procedure
John Pietras
john.pietras at gst.com
Mon May 4 15:02:03 EDT 2009
Yves,
I just noticed something that had slipped by me before - in CSTS
Framework R-0.18, the description of the Transfer-Data operation for the
Cyclic Report procedure (section 4.7.3.2) contain the new (as or R-0.18)
sentence "The TRANSFER-DATA is refined as required in 3.9.2.4.2 to carry
the monitoring parameters (names and values)." Since the Cyclic Report
procedure is supposed to be broader than "monitoring", I propose that
the sentence be restated as "The TRANSFER-DATA is refined as required in
3.9.2.4.2 to carry the cyclically-reported parameters (names and
values)."
Best regards,
John
John Pietras
GST, Inc.
7855 Walker Drive, Suite 200
Greenbelt, MD 20770
240-542-1155
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.ccsds.org/pipermail/css-csts/attachments/20090504/6807c7be/attachment.html
More information about the Css-csts
mailing list