[CMC] Results of Recent CMC Polls
CCSDS Secretariat
tomg at aiaa.org
Wed Apr 10 20:17:28 EDT 2013
CMC E-Poll Identifier: CMC-P-2013-03-009
Authorization to publish CCSDS
523.1-M-1, Mission Operations Message
Abstraction LayerJAVA API (Magenta Book, Issue 1)
Results of CMC poll beginning 22 March 2013 and ending 5 April 2013:
ADOPT: 8 (100%) (ASI, CNES,
CNSA, DLR, INPE, JAXA, NASA, UKSA)
ADOPT PROVISIONALLY: 0 (0%)
REJECT: 0 (0%)
REJECT WITH COMMENTS: 0 (0%)
Results are based on responses from 8 out of 11 members (72.73%).
No response was received from the following Agencies:
CSA
ESA
FSA
Secretariat Interpretation of Results: Adopted
Resulting CMC Resolution: CMC-R-2013-04-001
Inferred Secretariat Action: Publish Document
* * * * * * * * * * * * * * * * * * * *
CMC E-Poll Identifier: CMC-P-2013-03-010
Authorization to release CCSDS 766.1-R-1, Digital
Motion Imagery (Red Book, Issue 1) for CCSDS Agency review
Results of CMC poll beginning 22 March 2013 and ending 5 April 2013:
ADOPT: 8 (100%) (ASI, CNES,
CNSA, DLR, INPE, JAXA, NASA, UKSA)
ADOPT PROVISIONALLY: 0 (0%)
REJECT: 0 (0%)
REJECT WITH COMMENTS: 0 (0%)
Results are based on responses from 8 out of 11 members (72.73%).
No response was received from the following Agencies:
CSA
ESA
FSA
Secretariat Interpretation of Results: Adopted
Resulting CMC Resolution: CMC-R-2013-04-002
Inferred Secretariat Action: Release Review Document
* * * * * * * * * * * * * * * * * * * *
CMC E-Poll Identifier: CMC-P-2013-03-011
Authorization to Baseline the Projects in the Management Framework
Results of CMC poll beginning 26 March 2013 and ending 8 April 2013:
ADOPT: 4 (44.44%) (CSA, INPE, JAXA, UKSA)
ADOPT PROVISIONALLY: 5 (55.56%) (CNES, CNSA, DLR, ESA, NASA)
REJECT: 0 (0%)
REJECT WITH COMMENTS: 0 (0%)
CNES: Two comments for MOIMS area:
- Data Entity Dictionary Specificaton Language
(DEDSL) - XML Schema : CNES is said to have
editor+prototype responsibility on this project
while we are not aware of a new activity there
and it was decided at the last CMC not to conduct
a maintenance of this and other DAI documents ; To be clarified.
- Conjunction Data Message : CNES among other
agencies have supported the prototyping of the
CDM, which is not reflected, but is confirmed for
remaining activities. To be formalized, if needed.
CNSA: CNSA encourages our engineers to
make more contributions to the corresponding WG.
Recently several engineers of CNSA already
contacted to the WG Chair and conformed their
participation level. The present " Projects -
Resource View " table does not reflect the CNSA
participation status yet. But this does not
affect the decision for the WG continuing due to
CNSA participation levels are limited to
"contribute" and "monitor" now. However CNSA
would hope the Projects - Resource View could be
updated in the future to reflect CNSA participation status.
DLR: please see my remarks on the projects (sent to Mike as PDF)
ESA: Due to a very recent reduction of the
ESA 2013 standardisation budget, an adjustment of
the allocations to the different areas, including
CCSDS projects is underway. Therefore ESA cannot
confirm at this moment the resources refected in
the CCSDS Management Framework in their entirety.
ESA can thus only provisionally confirm the
resources and approve the programme of work contained in CWE.
In particular the ESA resources for the following
projects need to be re-confirmed:
CCSDS Symmetric Key Management Recommendations ESA(L)
Producer-Archive Interface Specification (PAIS) ESA(P2)
Improved Coding Schemes for the Proximity Link ESA(L)
Space Data Link Security Concept of Operation, Issue 1 ESA(L)
Space Data Link Security Concept of Operation, Issue 2 ESA(L)
SOIS-WIR Low data-rate wireless communications
for spacecraft monitoring and control ESA(L)
XML Specification for Electronic Data Sheets for Onboard Devices, ESA (LP)
Common Dictionary of Terms ESA (P)
Also the currently greyed items (not approved) cannot be confirmed.
For all other items, the effort alocation
indicated in the CWE is confirmed by ESA.
NASA: NASA confirms that our current plan
is to provide the resources that are documented
as "NASA-provided" in the current resource plan,
with two exceptions. NASA will "adopt" this
resolution after those changes are made in the Framework.
(1) For the Framework for Extensible Space
Communication Cross Support Service Management
in CSSM, remove NASA from the prototype, and
replace it with TBD. NASA does not have
resources assigned to this, and the WG chair said
that these prototypes were actually TBD.
(2) For the SOIS-WIR High data-rate wireless
communications for spacecraft monitoring and
control in the Wireless WG, our understanding is
that the document is planned to be
cancelled. Coordinate with the WG chair and
either cancel that document, or at least remove
NASA from the resources list for support to that project.
With those changes, NASA agrees to provide the
resources that NASA is signed up for. Also, NASA
agrees that the current resource plan for all
projects looks acceptable. We understand that
some documents have TBD for some resources still,
but those will be discused and decided on at the next meeting.
Results are based on responses from 9 out of 11 members (81.82%).
No response was received from the following Agencies:
ASI
FSA
Secretariat Interpretation of Results: Adopted Provisionally
Inferred Secretariat Action: Pending Disposition of Provisions
* * * * * * * * * * * * * * * * * * * *
More information about the CMC
mailing list