Hi Gippo,
I think it's the same issue regardless of which word you choose. What is planned / proposed as goals is not necessarily exactly what was the outcome. For example:
SAWG
Goal: Reach agreement on forward plan for MB and GB
Achievement: Agree to create a resolution to produce only a GB, based on analysis of the actual MOIMS & SOIS materials and the available resources.
I don't think it makes much different whether you call these status bullets or achievements, they are the result of the work (actual outcome) and not the plan for the work (Goals). If I am operating in some well organized production process where I have a lot of control over guidance and resources then I hope that my goals and my outcomes are well aligned. In a technology development process, which our work resembles, this connection can be less predictable. In a science process even more so. In our consensus based process, where we do not have as much control over guidance or resources the outcomes may be distinctly different from the planned goals.
At least that is my experience of the process. Perhaps yours differs.
Peter
From: Gian Paolo Calzolari <Gian.Paolo.Calzolari at esa.int>
Date: Tuesday, November 1, 2016 at 1:11 PM
To: Peter Shames <peter.m.shames at jpl.nasa.gov>
Cc: Erik Barkley <erik.j.barkley at jpl.nasa.gov>, CCSDS Engineering Steering Group - CESG Exec <cesg at mailman.ccsds.org>, "Wilmot, Jonathan J.(GSFC-5820)" <jonathan.j.wilmot at nasa.gov>, CESG <cesg-bounces at mailman.ccsds.org>
Subject: Re: [CESG] Updated template for WG Report to Area
Peter I did not say there was repetition between goals and achievements but rather between goals and status bullets.
Sent from my iPhone
On 01 Nov 2016, at 21:03, Shames, Peter M (312B) <peter.m.shames at jpl.nasa.gov<mailto:peter.m.shames at jpl.nasa.gov>> wrote:
I know we discussed this, but do not recall quite that conclusion. My recollection is the following:
Goals: We plan during the meeting to do xyz
Achievements: We actually did pqr
It is not necessarily the case the xyz == pqr, either in type nor in breadth or specificity of content. Therefore I think having them both still is of value, even if in many case they are, in fact, directly related.
Peter
From: CESG <cesg-bounces at mailman.ccsds.org<mailto:cesg-bounces at mailman.ccsds.org>> on behalf of Gian Paolo Calzolari <Gian.Paolo.Calzolari at esa.int<mailto:Gian.Paolo.Calzolari at esa.int>>
Date: Tuesday, November 1, 2016 at 12:12 PM
To: Erik Barkley <erik.j.barkley at jpl.nasa.gov<mailto:erik.j.barkley at jpl.nasa.gov>>
Cc: CCSDS Engineering Steering Group - CESG Exec <cesg at mailman.ccsds.org<mailto:cesg at mailman.ccsds.org>>, "Wilmot, Jonathan J.(GSFC-5820)" <jonathan.j.wilmot at nasa.gov<mailto:jonathan.j.wilmot at nasa.gov>>, CESG <cesg-bounces at mailman.ccsds.org<mailto:cesg-bounces at mailman.ccsds.org>>
Subject: Re: [CESG] Updated template for WG Report to Area
The point was that goals finished on being a subset of the status bullets; i.e. the presentation we had were basically saying
We had goal 1
We discussed goal 1
Fast reply 😊
Gippo
Sent from my iPhone
On 01 Nov 2016, at 20:09, Barkley, Erik J (3970) <erik.j.barkley at jpl.nasa.gov<mailto:erik.j.barkley at jpl.nasa.gov>> wrote:
Gippo,
I do remember you requested the goals to be removed, but I do not recall the rationale. Can you offer a rationale? It strikes me as rather odd to be reporting to management and not indicate what the goals for the last meeting cycle were and whether or not they have been met.
I do agree with the clarification between resolutions from the meetings vs. those upcoming in the next 6 months.
Nestor,
I have no significant issues with the format.
Best regards,
-Erik
From: CESG [mailto:cesg-bounces at mailman.ccsds.org] On Behalf Of Gian.Paolo.Calzolari at esa.int<mailto:Gian.Paolo.Calzolari at esa.int>
Sent: Tuesday, November 01, 2016 10:55 AM
To: Nestor.Peccia at esa.int<mailto:Nestor.Peccia at esa.int>
Cc: CESG <cesg-bounces at mailman.ccsds.org<mailto:cesg-bounces at mailman.ccsds.org>>; Wilmot, Jonathan J.(GSFC-5820) <jonathan.j.wilmot at nasa.gov<mailto:jonathan.j.wilmot at nasa.gov>>; CESG -- CCSDS-Engineering SteeringGroup(cesg at mailman.ccsds.org<mailto:cesg at mailman.ccsds.org>)(cesg at mailman.ccsds.org<mailto:cesg at mailman.ccsds.org>) <cesg at mailman.ccsds.org<mailto:cesg at mailman.ccsds.org>>
Subject: Re: [CESG] Updated template for WG Report to Area
My proposal as mentioned in Rome is:
Slide 2:
Remove goals
For "Working Group Status" change description to e.g.: [Progress Summary, Activity performed in this meeting (maximum 2 or 3 lines of text per bullet)]
Move "Achievements" from slide 3 to slide 2
Have items in this sequence: "Working Group Status" + "Interaction with other WGs" + "Achievements" + "Problems and Issues"
Slide 3
Move "Achievements" from slide 3 to slide 2
Change from "Resolutions expected in the next 6 months" to e.g. "Resolutions in this meeting and till next meeting" (just to avoid that somebody thinks that a resolution finalized in the meeting shall be not be listed :o)
Best regards
Gippo
From: Nestor.Peccia at esa.int<mailto:Nestor.Peccia at esa.int>
To: "CESG -- CCSDS-Engineering SteeringGroup(cesg at mailman.ccsds.org)(cesg at mailman.ccsds.org)<mailto:cesg at mailman.ccsds.org)(cesg at mailman.ccsds.org)>" <cesg at mailman.ccsds.org<mailto:cesg at mailman.ccsds.org>>, "Wilmot, Jonathan J.\(GSFC-5820\)" <jonathan.j.wilmot at nasa.gov<mailto:jonathan.j.wilmot at nasa.gov>>
Date: 01/11/2016 18:32
Subject: [CESG] Updated template for WG Report to Area
Sent by: "CESG" <cesg-bounces at mailman.ccsds.org<mailto:cesg-bounces at mailman.ccsds.org>>
________________________________
Dear all,
following a "salami technique" approach,
please find attached an updated WG report template for your review
Let me have your comments by Friday 4th Nov 2016 cob. No comments by then implies you are happy with the updated template.
I will then produce a new version and distribute it to all WG Chairs for further comments
Once the cycle is finished I will continue with the Area report template
ciao
nestor
this message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
[attachment "d01-WG-Report-to-Area-Fall 2016-Template-v4.pptx" deleted by Gian Paolo Calzolari/esoc/ESA] _______________________________________________
CESG mailing list
CESG at mailman.ccsds.org<mailto:CESG at mailman.ccsds.org>
https://mailman.ccsds.org/cgi-bin/mailman/listinfo/cesg
this message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
this message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
this message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/cesg/attachments/20161101/cf590a60/attachment.html>
More information about the CESG
mailing list