[CESG] CCSDS Strategic Plan Draft Issue 8 Version 1

Stuart Fowell Stuart.Fowell at scisys.co.uk
Wed Sep 11 10:55:33 EDT 2013


Nestor,

 

I've produced a first, incomplete draft of the SOIS Area and passed it
to Chris to complete and review. Unfortunately he is on holiday until
16th so we will miss this deadline.

 

Regards,

 

Stuart

 

From: cesg-bounces at mailman.ccsds.org
[mailto:cesg-bounces at mailman.ccsds.org] On Behalf Of
Nestor.Peccia at esa.int
Sent: 10 September 2013 18:02
To: cesg at mailman.ccsds.org
Subject: [CESG] CCSDS Strategic Plan Draft Issue 8 Version 1

 

R E M I N D E R 
============== 

Deliver your updated Area section to the CESG by Friday 13th Sep 2013
cob 


Dear all 

You will find below the suggested " way forward". 

Assumptions 

1.	The Tactical Plan is the CWE View showing Charters, Projects,
Resources, Schedule. It is regularly updated by the WG chairs and
accessible via the CWE 

2.	The CCSDS Strategic Roadmap is the Strategic Plan showing the
mapping between CCSDS Technical Goals, Area goals/sub-goals and existing
/ at work / future recommended standards and practices (including the
associated products / works). A goal / sub-goal can have several
standards (projects) associated to it. 

3.	We use a timeline (i.e. By 2018 ....., By 2020 ..., By 2022
...). For future projects, tentative date for the publication of the
standard can be put in the plan. 

4.	We do not show interdependencies between WGs and Projects in the
Strategic Plan 

5.	We show in our mapping (CCSDS tech. goals, Area goals/sub-goals,
BB/MB) all books to be produced in the future 

6.	We also show in our mapping (CCSDS tech. goals, Area goals,
BB/MB) all active books (BB/MB) produced in the past. GB supporting a BB
are not needed, but standalone GBs serving its own purpose need to be
included 

7.	We use the following mapping (to be generated by each area). The
graphical roadmap form (if required by CMC) could be easily generated by
the secretariat 
	Issue 8 Version 1 (attached below) contains as an example the
text form (suggested by Gippo) for the NAV WG


MOIMS-Goal                        2                 

Description of goal 
MOIMS 2: to finalize the recommended standards for the exchange of
Navigation information (e.g. position, velocity and attitude) by
establishing content and format for tracking, attitude, trajectory,
pointing maneuver and ancillary data (e.g., gravity models, spacecraft
orientation).   

Related CCSDS Strategic Goals        2, 3, 6 

Existing standards 
Recommended Standard CCSDS 505.0-B-1 XML Specification for Navigation
Data Messages 
Recommended standard CCSDS 502.0-B-2 Orbit Data Message 
Recommended standard CCSDS 503.0-B-1 Tracking Data Message 
Recommended standard  CCSDS 504.0-B-1 Attitude Data Message     (if we
agree to include it, moreover could be moved to bottom to focus better
on future) 

Future works             
CWE Doc. 510.0 Navigation Hardware Message (NHM)
MIL-MOIMS-01                2016 
CWE Doc. 509.0 Pointing Requests Message (PRM)
MIL-MOIMS-02                2015 
CWE Doc. 511.0 Spacecraft Maneuver Message (SMM)
MIL-MOIMS-03                2016 


What shall you do ? 

1.	Take the section of the Plan corresponding to your Area 

2.	Modify it according to the assumptions  (analysing also the
comments included in Draft 8 V1 for your Area) 

3.	Deliver your updated Area section to the CESG by Friday 13th Sep
2013 cob 

4.	CESG Chair will produce a new Issue 8 V2 by Tuesday 17th Sept
2013 

5.	We discuss the inputs, issues and final proposed schedule during
our webex on 18th Sept 2013


[attachment "CCSDS-StratPlan-A01x1y1x1-d8v1-16Aug13.docx" deleted by
Nestor Peccia/esoc/ESA] 

ciao 
nestor

This message and any attachments are intended for the use of the
addressee or addressees only. The unauthorised disclosure, use,
dissemination or copying (either in whole or in part) of its content is
not permitted. If you received this message in error, please notify the
sender and delete it from your system. Emails can be altered and their
integrity cannot be guaranteed by the sender.
 
Please consider the environment before printing this email.


SCISYS UK Limited. Registered in England and Wales No. 4373530.
Registered Office: Methuen Park, Chippenham, Wiltshire SN14 0GB, UK.
 
Before printing, please think about the environment.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.ccsds.org/pipermail/cesg/attachments/20130911/dec4b72e/attachment-0001.htm


More information about the CESG mailing list