[Cesg-all] Results of CESG Polls closing 23 April 2015
ccsds techsupport
ccsds_techsupport at aiaa.org
Wed Apr 29 02:08:49 UTC 2015
CESG E-Poll Identifier: CESG-P-2015-04-001 Creation the MOIMS Mission Planning and Scheduling WG
Results of CESG poll beginning 09 April 2015 and ending 23 April 2015:
Abstain: 0 (0%)
Approve Unconditionally: 7 (87.5%) (Barkley, Merri, Behal, de Cola, Calzolari, Suess, Barton)
Approve with Conditions: 1 (12.5%) (Shames)
Disapprove with Comment: 0 (0%)
CONDITIONS/COMMENTS:
Barkley - A comment: the goals section of the charter ends mid-sentence as presented for the poll. My assumption is that the goals, to be consistent with the stated scoping of "...The submission of Planning Requests (input to Mission Planning) • The distribution of Plans/Schedules (output of Mission Planning)..." will include blue books specifications for these two items.
Shames - I have two concerns about this WG, as stated in the charter and white paper:
1) The focus in most of these materials seems to be on SM&C and how it can solve the problem, rather than on Mission Planning and a clear presentation of what they need. This is both "cart before the horse" and looks like an overly tight binding that may be detrimental to the overall usability of the resulting standards.
2) The WG leadership is exclusively Euro-centric. Since there does appear to be a significant North American interest in this it would be sensible to broaden the coverage to recognize that.
Total Respondents: 8
No response was received from the following Area(s):
SECRETARIAT INTERPRETATION OF RESULTS: Approved with Conditions
PROPOSED SECRETARIAT ACTION: Once Conditions are met start CMC Poll
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/cesg-all/attachments/20150429/5cce718b/attachment.html>
More information about the CESG-All
mailing list