[CMC] Re: [Cesg-all] CMC Poll Results for April 2006

Dissinger Neil (CCSDS Sub Contr) neil.dissinger at btas.com
Thu Apr 20 13:39:18 EDT 2006


Jean-Luc,
 
A CMC resolution at the 2006 Fall meetings approved a concurrent CESG and CMC review of Green Books:
 

		CMC-R-0510-14     Resolves to modify Procedures and Restructuring documents to state that Green books are reviewed concurrently by the CESG and CMC.

The concurrent review was implemented to speed up the approval process for Green Books.  There were discussions about this process at both the CESG and CMC meetings.  After the comments from the CESG ADs are resolved the document will be submitted to the CMC for final approval.  
 
Regards,
 
Neil

 
________________________________

From: cmc-bounces at mailman.ccsds.org on behalf of Jean-Luc.Gerner at esa.int
Sent: Thu 4/20/2006 12:43 PM
To: Oliver Brian (BTAS)
Cc: Jean-Francois.Kaufeler at esa.int; Gian.Paolo.Calzolari at esa.int; cmc at mailman.ccsds.org; cesg-all-bounces at mailman.ccsds.org; cesg-all at mailman.ccsds.org
Subject: [CMC] Re: [Cesg-all] CMC Poll Results for April 2006



Oliver,
I cannot agree with your report below.
CCSDS 350.1-G-1 was submitted to CMC without CESG approval; CESG review was
completed 14 April:

CCSDS 350.1-G-1  has been approved conditionally by SIS and SLS and only
after the 'conditions' are resolved will it be possible to submit it to CMC
for final approval.
I take the CMC voting is void.

best regards
Jean-Luc Gerner
TEC-ETN
Tel: +31 71 565 4473


                                                                            
             "Oliver Brian                                                  
             (BTAS)"                                                        
             <brian.oliver at btas                                           To
             .com>                      cmc at mailman.ccsds.org,              
             Sent by:                   cesg-all at mailman.ccsds.org          
             cesg-all-bounces at m                                           cc
             ailman.ccsds.org           "Tom Gannett (CCSDS Sub Contr)"     
                                        <tom.gannett at btas.com>              
                                                                     Subject
             20/04/2006 17:48           [Cesg-all] CMC Poll Results for     
                                        April 2006                          
                                                                            
                                                                            
                                                                            
                                                                            
                                                                            
                                                                            




CMC E-Poll Identifier:  CMC-R-2006-03-006: Green Book approval of Security
Threats Against Space Missions, CCSDS 350.1-G-1
Secretariat Interpretation of Results:  Adopted
Resulting CMC Resolution:               TBD
Inferred Secretariat Action:            Release Document

The CMC,

CONSIDERING that the Security Threats Against Space Missions, CCSDS
350.0.1-G-1 has previously been submitted for CESG review
(CESG-R-2005-08-005) and was not approved;

and ACKNOWLEDGING that the issues concerning the disapproval have been
resolved;

and RECOGNIZING that Green Books require concurrent approval from the CESG;

RESOLVES that Security Threats Against Space Missions, CCSDS 350.0.1-G-1 be
published as an Issue-1 Informational Report.

Results of CMC poll beginning 3 March 2006 and ending 14 April 2006:

ADOPT:  3 (100%) (ASI, CNES, INPE)
ADOPT PROVISIONALLY:  0 (0%)
REJECT:  0 (0%)
REJECT WITH COMMENTS:  0 (0%)

Results are based on responses from 3 out of 10 members (30%).

No response was received from the following Agencies:

BNSC
CSA
DLR
ESA
FSA
JAXA
NASA

* * * * * * * * * * * * * * * * * * * *
CMC E-Poll Identifier:  CMC-A-2006-03-001: Request for Data Compression
Requirements


Secretariat Interpretation of Results:  Action Completed
Resulting CMC Resolution:               TBD
Inferred Secretariat Action:            Interpret Requirements


Agencies are requested to provide their data compression requirements (e.g.,
hyper-/multi-spectral, radar signal, etc.) for future missions that could be
developed by the SLS Data Compression WG into CCSDS Recommended Standards.

Results of CMC poll beginning 3 March 2006 and ending 14 April 2006:

Agency has no requirements at this time:  2 (50%) (INPE, JAXA)
Agency has the following future data compression requirements:  2 (50%) (ASI,
CNES)


ASI - ASI is interested in data compression for hyper/multi-spectral and SAR
data.
CNES - At CNES level, we may be interested in developing within CCSDS
framework a solution for hyper and multi-spectral images compression.  This
assumes that the charter of the WG is revised or a new BOF is created.

Results are based on responses from 4 out of 10 members (40%).

No response was received from the following Agencies:
BNSC
CSA
DLR
ESA
FSA
NASA

* * * * * * * * * * * * * * * * * * * *
 _______________________________________________
CESG-all mailing list
CESG-all at mailman.ccsds.org
http://mailman.ccsds.org/mailman/listinfo/cesg-all



_______________________________________________
CMC mailing list
CMC at mailman.ccsds.org
http://mailman.ccsds.org/mailman/listinfo/cmc


-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.ccsds.org/pipermail/cesg-all/attachments/20060420/afcd5e40/attachment.html


More information about the CESG-all mailing list