[Smwg] CCSDS Updated Action Items from 8 Aug Telecon
Tuttle, Karen L. (GRC-MSI0)
karen.l.tuttle at nasa.gov
Wed Aug 16 21:33:58 UTC 2017
Dear CSSM Colleagues,
The actions have been updated from the 8 Aug telecom. The action list has been uploaded to the CWE Private – Beta and are attached.
The following actions are due between now and 31 Aug. I have also included actions that have not been assigned a due date at the end so please notice those too:
AI#
Action
Assignee
Due Date
2017-0627-04
Review the latest config profile tech note
All
10-Jul-17
2017-0512-29
Write a RID to update the Abstract Event model in the SoS
CH
11-Jul-17
2016-1017-4
Check the Planning Event terminology with the CCSDS glossary
CH
17-Jul-17
2017-0512-16
Provide strawman of proposed event sequence structuring
EB
17-Jul-17
2017-0512-17
Prepare strawman UML diagram of the configuration profile
MG
17-Jul-17
2017-0512-21
Complete CWE file restructure
KT
17-Jul-17
2017-0512-35
Draft initial SMURF schema
CH
17-Jul-17
2017-0512-36
Update SMURF text to be consistent with UML diagram from San Antonio meeting
CH
17-Jul-17
2017-0512-32
Dispose SoS RIDs Update Books
CH
21-Jul-17
2017-0512-33
Update SoS Prototype Test Report
EB
21-Jul-17
2017-0512-04
Update AbstractEvent model based on discussion with the NAV WG
CH
30-Jul-17
2017-0512-06
Develop PIF Test case outline for test plan
EB
30-Jul-17
2017-0512-07
Determine structure of PIF (flat vs structured)
EB, CH
30-Jul-17
2016-1017-5
Add PIF test case for space-based aperture
JPC
31-Jul-17
2017-0512-11
Prepare a presentation on service package proposal (re: state machine)
MG
31-Jul-17
2017-0512-39
Update TGFT white book with XFDU decisions
CH
31-Jul-17
2017-0512-40
Finalize the TGFT meta data definition
CC
31-Jul-17
2017-0512-43
Update Draft TGFT Test Plan with testing details
CC, HL
31-Jul-17
2017-0512-45
Check the draft restricted XFDU schema supplied by JVP and update as determined
CC
31-Jul-17
2017-0512-46
Extend the restricted XFDU schema to include TGFT specific meta data
CC
31-Jul-17
2017-0512-05
Add PIF SM Abstract Event in Common Class tab in Inter-recommendation spreadsheet
KT
1-Aug-17
2016-1021-19
Produce outline of SMURF Test cases/plan
EB, KT, MG
11-Aug-17
2017-0512-03
Update PIF book and schema based on conclusion re-structuring, etc.
CH
16-Aug-17
2017-0512-41
Produce strawman outline for ground observation sequence for DDOR
EB
16-Aug-17
2017-0512-42
Produce 1st cut of DDOR config parameters and indicate where they go in FRM
EB
16-Aug-17
2017-0512-13
Look at SPR, the SMURF, config profile and event sequence and propose how these can fit together
EB
17-Aug-17
2017-0512-34
Write a tech note to indicate registry update policy for the CSSM for example in the SoS,how is someone to know that they need to change the version number in section D2.8 or how does someone know to clone the section D2.8 and modify it for a different recommendations
EB
17-Aug-17
2017-0512-37
Coordinate SMURF prototyping environment
MG, CH
18-Aug-17
2017-0512-47
Provide Service Catalog inputs on statements for service performance; eg "gain should be provided for 45 deg"
EB
29-Aug-17
2017-0808-01
Generate an example that synthesizes Mars relay coordination input along with the structuring discussion for the EventAssociation metadata
EB
29-Aug-17
2017-0512-10
Exercise: Assume structure similar to DSN; check that events in PIF make sense for DSN
EB
30-Aug-17
2017-0512-23
Update SoS schema and send to SANA
CH
30-Aug-17
2017-0512-55
Clean up the control architecture diagrams and further iterate with CSTS and CSSM
EB
30-Aug-17
2017-0512-38
Complete draft of SMURF test plan
KT
31-Aug-17
2017-0627-01
Review Service Package Data Format First Draft
All
2017-0627-02
For the PIF, determine what format the SGSS is using for FDF (visibility vectors)
JPC
2017-0627-03
Update PIF structure diagram presented at the 27 June telecon
EB
2017-0711-01
Develop first cut/for the proposal on what the optional part of the PIF looks like
EB, YW
2017-0718-01
Provide XML schema rationale revision for SoS RID
MG
2017-0718-02
Provide analysis of XML./XML schema versus implementation specific considerations for SoS RID
CH
2017-0718-05
Produce update to TGFT scenerios list
CC
Regards,
Karen
--
Karen L. Tuttle
NASA Glenn ISS Payload Operations Center, Project & Integration Manager
216 433-5297 (Office)
216 308-6922 (Work Cell)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/smwg/attachments/20170816/4ca9bfbf/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: CSSMWG-ActionItemList 8Aug17.xlsx
Type: application/vnd.openxmlformats-officedocument.spreadsheetml.sheet
Size: 98711 bytes
Desc: CSSMWG-ActionItemList 8Aug17.xlsx
URL: <http://mailman.ccsds.org/pipermail/smwg/attachments/20170816/4ca9bfbf/attachment.xlsx>
More information about the SMWG
mailing list