[SLS] Your comments needed for SANA document under poll // 313x0y21_CESG_Approval.pdf
Gian.Paolo.Calzolari at esa.int
Gian.Paolo.Calzolari at esa.int
Thu Feb 6 15:59:57 UTC 2020
Dear All,
the attached document is under CESG Poll.
Since "The document describes the relationship between SANA and the other
stakeholders within CCSDS, such as the CCSDS Engineering Steering Group
(CESG), the CMC, WGs, and the CCSDS Secretariat" it is potentially
affecting all your activities.
For this reason any comment (to be reflected in the SLS vote to the CESG
Poll) is welcome by
13 February COB.
Thanks
Gian Paolo
PS As preliminary comments.....
1) I think section 3.6. should be split between "WG Relationship" and
"CESG Relationship" as e.g. the very first sentence "The SANA Operator
shall be informed by a WG of any new registries, or of changes to existing
registries, prior to when the WG submits the Red Book (or Pink Sheet) for
its first agency review." does affect WGs and not CESG. ACtually there is
a section 3.10 for WGs but thiss should be put earlier as WGs are the
first to start interaction with SANA.
2) Sentence "The CESG shall review the Candidate registry prior to
approving the release of the document for its first Agency review." is
ambiguous as it looks there is dedicated review of the candidate review
while there is simply a CESG Poll to approve releasing a document - that
includes a SANA Annex - for Agency Review)
3) Also the following sentence "When clarifications or changes are
required, they must be performed by the WG prior to the request for
approval of the document for Agency Review" is part of the actions after a
failed CESG poll (rejected or approved with conditions).
4) The sentence "This last technical review will be done prior to CESG
approval to publish." introduces an additional dedicated Review to be
performed before the CESG Poll for publication.
5) The final NOTE in section 3.6 is just ambygous. Does CESG mean CESG
Chair? Who will trigger the verification on the SANA Beta site?
6) The contents of the SANA Annex as describe din 3.9 (The SANA
Considerations shall document all information needed for SANA to make
assignments or changes to, or to create new registries.) actually describe
the interaction required with SABA before publication. Is the reader of
the published document interested in this or should the annex rather
describe which registries are avaiable after that process and with which
rules/constraints?
etc etc.
This message is intended only for the recipient(s) named above. It may contain proprietary information and/or
protected content. Any unauthorised disclosure, use, retention or dissemination is prohibited. If you have received
this e-mail in error, please notify the sender immediately. ESA applies appropriate organisational measures to protect
personal data, in case of data privacy queries, please contact the ESA Data Protection Officer (dpo at esa.int).
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/sls/attachments/20200206/64d622e5/attachment-0001.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: 313x0y21_CESG_Approval.pdf
Type: application/octet-stream
Size: 105002 bytes
Desc: not available
URL: <http://mailman.ccsds.org/pipermail/sls/attachments/20200206/64d622e5/attachment-0001.obj>
More information about the SLS
mailing list