[SLS] Fwd: [CESG] News from CMC" Part 1

Gian.Paolo.Calzolari at esa.int Gian.Paolo.Calzolari at esa.int
Wed Apr 27 15:56:18 UTC 2016


For info and comment within area
Regards
Gian Paolo

Sent from my iPhone

Begin forwarded message:

> From: Nestor.Peccia at esa.int
> Date: 27 April 2016 at 17:47:50 GMT+2
> To: "CCSDS Engineering Steering Group - CESG Exec(cesg at mailman.ccsds.org)" <cesg at mailman.ccsds.org>
> Subject: [CESG] News from CMC" Part 1
> 
> Dear all 
> 
> Some news from the CMC meeting: 
> Prototype 2 missing resources 
> CMC has completed his action on missing resources, Conclusion is as follows:
> CMC polls are on-going to grant resources for SM&C Projects (MAL Binding to TCP/IP, CNES = 1 mm and MAL Binding to ZeroMQ, ESA = 1 mm)
> Two additional resources have been found for NAV ADM 5 year review (ESA proto 2 resources granted) and DTN BSP (DLR proto 2 resources granted). CMC approved unanimously both Projects. WG Chairs (i.e. Keith for DTN and David for NAV) to include the related resources in the CWE Project. @ Mario / Brigitte: Please contact David Berry
> We are still missing 5 proto 2 resources excluding TEL BB, for which the CMC assumes that the WG will be disbanded soon.
> NAV PRM
> NAV NHW
> NAV SSM
> SM&C MAL XML encoding
> SM&C Data Product Distribution Services
> As the CMC does not intend to deploy resources for these Projects in the near future, WGs are asked to review their work plan and assess if it makes sense to cancel the Project. I have mentioned that for the XML encoding we are awaiting the closure of an action placed upon JPL on the bilateral shadow projects. 
> @ Mario / Brigitte: Please contact David Berry / Franck Dreger and Dan Smith / Sam Cooper
> New Projects to be submitted for approval before mid October 2016 
> I was asked yesterday by the CMC to produce a list of the Draft Projects that will be submitted for approval (and granting of resources in the period 2016/2017/2018) in the next 6 months. I have produced a draft list (and sorry if I have made some mistakes but there was no time for requesting your feedback)
>  
> The CMC compared this list with its priorities and gave in real time its agreement (or its lack of) to deploy resources when the related polls are issued. ESA was not in a position to grant resources for the years 2017/2018 
> @ all ADs/DADs: Please let me know if I have omitted any Project to be submitted for CMC approval before mid October 2016 
> The chart has been added to the presentation " ...extra agenda items..." and is uploaded in the CWE
> New action placed upon the CESG (ADs/DADs) 
> CMC requests that the following is included in every Area future presentation to the CMC
> Area Document Summary (as SIS did in its last presentation)
> List of Projects to be submitted for approval (and granting of resources) in the next 6 months
> I will include both items when proposing a new template for the CESG Presentation to the CMC
> Technical Meeting Duration 
> There was a length discussion about technical meeting duration wiyhout any conclusion. I, as CESG Chair, have proposed to take the ASI meeting as pilot to have a maximum of 12 meeting rooms per day in order to optimise the room utilisation on Monday and Friday. CESG Chair (together with the Secretariat) will help in solving the coflicts and overlaps.
> Lunar / Mars Exploration standards 
> Although IOAG has agreed (after a CCSDS request) to look at the future Lunar / Mars Missions to discover potential gaps or missing standards, every AD/DAD/WG Chairs are invited to discuss the issue during next webex or technical meetings, @ ADs/DADs : Please pass the message to your WG Chairs
> 
> Part 2 will be sent tomorrow 
> 
> ciao 
> nestor
> This message and any attachments are intended for the use of the addressee or addressees only.
> The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
> content is not permitted.
> If you received this message in error, please notify the sender and delete it from your system.
> Emails can be altered and their integrity cannot be guaranteed by the sender.
> 
> Please consider the environment before printing this email.

This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/sls/attachments/20160427/6dac004f/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: mime.gif
Type: image/gif
Size: 36924 bytes
Desc: not available
URL: <http://mailman.ccsds.org/pipermail/sls/attachments/20160427/6dac004f/attachment.gif>


More information about the SLS mailing list