[Sls-slp] Draft 2022 Spring CCSDS SLP WG Agenda
Davarian, Faramaz (US 9700)
faramaz.davarian at jpl.nasa.gov
Fri May 6 22:32:46 UTC 2022
Is there a meeting invitation? I do not have it.
From: "Kazz, Greg (US 312B)" <greg.j.kazz at jpl.nasa.gov>
Date: Wednesday, April 13, 2022 at 2:41 PM
To: "sls-slp at mailman.ccsds.org" <sls-slp at mailman.ccsds.org>, Faramaz Davarian <faramaz.davarian at jpl.nasa.gov>
Cc: "secretariat at mailman.ccsds.org" <secretariat at mailman.ccsds.org>
Subject: Draft 2022 Spring CCSDS SLP WG Agenda
Dear SLP WG,
Below please find my recommendation for our Spring 2022 SLP WG meeting to be held virtually via Webex (Invite to follow soon) on Monday May 9, 2022 starting at 7 AM PDT (16:00 CET).
I believe the meeting will last between 2 to 3 hours.
Faramaz – please let us know, if you have made any substantial changes to your lunar concept paper.
All meeting materials can be found on our SLP WG directory for this Spring meeting on the CCSDS CWE at:
https://cwe.ccsds.org/sls/docs/Forms/AllItems.aspx?RootFolder=%2Fsls%2Fdocs%2FSLS%2DSLP%2FMeeting%20Materials%2F2022%2FSpring&FolderCTID=0x012000439B56FF51847E41B5728F9730D7B55F&View=%7BAE8FB44C%2DE80A%2D42CF%2D8558%2DFB495ABB675F%7D
____________________________________________________________________________________________________________________________________________________
SLP WG Agenda
7:00 AM – Greetings, overview of Agenda
7:05AM – Matt Cosby will talk to the 3 technical corrigenda proposed for Annex C (Prox-1 frame to USLP mapping) in USLP (732.1-B). Goal is to gain consensus on these updates.
7:15 or 7:20 – Faramaz Devarian (NASA/JPL) will talk to his proposal for Lunar S-band Proximity Links – Goal is to understand any changes to Prox-1 Space Data Link Protocol*
8:00 or so – Greg Kazz to discuss updates to Overview of Space Comm Protocols GB (CCSDS 130.0-G-)
8:20 or so – Greg Kazz to discuss Space Packet Protocols GB – 1st edition (CCSDS 130.3-G)
Depending upon questions, comments, and concerns, anticipate the meeting closing around 9 to 9:30 AM PDT
*Minimum anticipated changes in CCSDS 211.0-B-6: Paragraphs B1.2.4, B1.4.6.4, B1.7.11, B1.4.4 will need to be modified to account for the rate 2/3 LDPC. Also, the Transmitter Modulation (B1.2.5) and Receiver Modulation (B1.4.5) parameters in the directives most likely will need to be changed to include GMSK and filtered OQPSK.
Best regards and look forward to hearing from you then,
Greg Kazz
Principal Engineer
Technical Group Supervisor,
312B Project Protection, Project Software, and End to End Information System Engineering
Jet Propulsion Laboratory
4800 Oak Grove Dr., M/S 301-490
Pasadena, CA 91109
1+(818)393 6529(voice)
1+(818)393 6871(fax)
email: greg.j.kazz at jpl.nasa.gov
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/sls-slp/attachments/20220506/badf36a9/attachment.htm>
More information about the SLS-SLP
mailing list