[Sea-sa] Next telecon planning
Shames, Peter M (312B)
peter.m.shames at jpl.nasa.gov
Fri Jun 2 14:39:49 UTC 2017
Hi Hany,
My suggestion is that you go look at the materials that are out on the CWE from the last meeting. That should give you a good idea of what we are doing and the approach we are taking.
https://cwe.ccsds.org/sea/docs/Forms/AllItems.aspx?RootFolder=%2Fsea%2Fdocs%2FSEA-SA%2FMeeting%20Materials%2F2017&FolderCTID=0x012000F83FD93BEFF45E4FB5D1769B01CA762F&View={A709F322-0E67-45C7-932D-CB78C55CE268}<https://cwe.ccsds.org/sea/docs/Forms/AllItems.aspx?RootFolder=%2Fsea%2Fdocs%2FSEA-SA%2FMeeting%20Materials%2F2017&FolderCTID=0x012000F83FD93BEFF45E4FB5D1769B01CA762F&View=%7bA709F322-0E67-45C7-932D-CB78C55CE268%7d>
Thanks, Peter
From: "Fawzy, Hany (ASC/CSA)" <hany.fawzy at canada.ca>
Date: Friday, June 2, 2017 at 5:29 AM
To: Peter Shames <peter.m.shames at jpl.nasa.gov>, SEA-SA <sea-sa at mailman.ccsds.org>
Subject: RE: Next telecon planning
Sir,
No problem, just wanted to confirm. Tuesday, June 6th is better for me as I have a Kickoff meeting on Wednesday with the Swedish space corporation. This would be my first meeting, and I am looking forward to attending.
Thanks for allowing me to participate.
Regards,
Hany
From: Shames, Peter M (312B) [mailto:peter.m.shames at jpl.nasa.gov]
Sent: June-01-17 6:27 PM
To: Fawzy, Hany (ASC/CSA); SEA-SA
Subject: Re: Next telecon planning
Hi Hany,
You are right … we are talking JUNE and not May. Sorry for the confusion. I was in a rush and forgot that the month ticked over last night.
Can we do this on either on Wednesday, 7 June or Tuesday, 6 June, at those same times?
Peter
From: "Fawzy, Hany (ASC/CSA)" <hany.fawzy at canada.ca<mailto:hany.fawzy at canada.ca>>
Date: Thursday, June 1, 2017 at 12:55 PM
To: Peter Shames <peter.m.shames at jpl.nasa.gov<mailto:peter.m.shames at jpl.nasa.gov>>, SEA-SA <sea-sa at mailman.ccsds.org<mailto:sea-sa at mailman.ccsds.org>>
Subject: RE: Next telecon planning
Hello,
I am new to the group representing the Canadian Space Agency.
Are we talking about June 8th or this is an email that I am getting and the event already passed?
Thanks,
Hany
--------------------------------------------------------------------------------------------------------------------
Hany Fawzy, Ph.D, ing, P.Eng
Ingénieur principal des systèmes, Utilisation de l'Espace
Agence spatiale canadienne / Gouvernement du Canada
Hany.Fawzy at Canada.ca<mailto:Hany.Fawzy at Canada.ca> / Tél/Tel : (450) 926-6772 | Téléc/Fax: (450) 926-6620
Senior Systems Engineer, Space Utilisation
Canadian Space Agency / Government of Canada
Hany.Fawzy at Canada.ca<mailto:Hany.Fawzy at Canada.ca> / Tél/Tel : (450) 926-6772 | Téléc/Fax: (450) 926-6620
[cid:image001.gif at 01D2DB73.69FDAC00]
From: SEA-SA [mailto:sea-sa-bounces at mailman.ccsds.org] On Behalf Of Shames, Peter M (312B)
Sent: June-01-17 3:52 PM
To: SEA-SA
Subject: [Sea-sa] Next telecon planning
Importance: High
Guys,
I just looked at my calendar and I have a conflict for next Thursday, 8 May, at our usual time, 0700 Pacific (0800 Mountain, 1500 UK, 1600 Europe, 2200 China).
Can we do this on either on Wednesday, 7 May or Tuesday, 6 May, at those same times?
Draft Agenda
1. Roger, feedback / discussion on edits to MOIMS materials
2. Ray, status of SOIS edits as a result of re-engineering their architecture views
Changes to this draft?
Thanks, Peter
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/sea-sa/attachments/20170602/01d6ee4a/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.gif
Type: image/gif
Size: 5102 bytes
Desc: image001.gif
URL: <http://mailman.ccsds.org/pipermail/sea-sa/attachments/20170602/01d6ee4a/attachment.gif>
More information about the SEA-SA
mailing list