Dear MOIMS WG leads,

There are 2 items from yesterday's CESB WebEx that require your support:

1) Update of on-line Strategic Plan
There are still open actions on DAI and TEL as already reminded you on my 
emails of 24Nov15, 05Jan16 and 19Jan16. It would be very nice to hear from 
you as this is the 4th time I am reminding you this!

2) CWE Projects behind schedule
There are a number of projects that appear "behind schedule" in CWE. 
Please fix them. They are:

DAI
Data Entity Dictionary Specificaton Language (DEDSL) - XML Schema
Information Lifecycle and Long Term Usage
Producer Archive Interface Specification Tutorial

SM&C
Mission Operations - Massage Abstraction Layer Binding to HTTP Transport 
and XML Encoding
Mission Operations - Message Abstraction Layer Binding to ZeroMQ Transport 
and CNES Binary Encoding
Mission Operations C++ API

TEL
Telerobotic Operations
Telerobotic Standard (Blue Book)

Best regards,

__Mario
----- Forwarded by Mario Merri/esoc/ESA on 28/01/2016 08:35 -----

From:   Nestor.Peccia at esa.int
To:     "CESG -- CCSDS-Engineering Steering Group (cesg at mailman.ccsds.org) 
(cesg at mailman.ccsds.org)" <cesg at mailman.ccsds.org>
Date:   27/01/2016 19:43
Subject:        [CESG] Draft Notes CESG 2016 webex No 1
Sent by:        cesg-bounces at mailman.ccsds.org



Dear all, 
Please find below the draft notes 
Comments welcome by Monday 1st Feb 2016 
ciao 
nestor 
Actions status
        CMC-A-2015-11-02 SANA was requested to circulate a list, by 
agency, of the SCIDs that should be returned to SANA. 
        CMC member agencies should provide a response to SANA by 31 
January 2016.   List circulated. Expecting responses from all Agencies 
CMC-A-2015-11-03 The CMC instructed the SE AD to create a resolution as a 
result of a CMC poll that would inform the 
        agencies that SANA plans to take back the simulator IDs assigned 
to them  Action: Peter Shames  CLOSED 
CMC-A-2015-11-10 The CESG chair was instructed to clarify the Time 
Transfer, Clock Correlation, and Time 
Synchronization projects from the ICPA/IOAG presentation. Action Nestor 
Peccia   Open 
Document queue status
2 SEC WG GB need a poll to be silverised 
CCSDS 766.2-R-0, Voice and Audio Communications (Proposed Red Book) Poll 
to be issued soon 
CCSDS 911.1-B-3.1, Space Link Extension?Return All Frames Service 
Specification (Draft Blue Book) Poll to be issued soon 
CCSDS 911.2-B-2.1, Space Link Extension?Return Channel Frames Service 
Specification (Draft Blue Book) Poll to be issued soon 
CCSDS 911.5-B-2.1, Space Link Extension?Return Operational Control Fields 
Service Specification (Draft Blue Book) Poll to be issued soon 
CCSDS 912.1-B-3.1, Space Link Extension?Forward CLTU Service Specification 
(Draft Blue Book) Poll to be issued soon 
CCSDS 912.3-B-2.1, Space Link Extension?Forward Space Packet Service 
Specification (Draft Blue Book) Poll to be issued soon 
CCSDS 130.12-G-0, CCSDS Protocols over DVB-S2?Summary of Definition, 
Implementation and Performance (Draft Green Book) by end Feb 2016 
CCSDS 651.2-G-0, Producer-Archive Interface Specification (PAIS)?A 
Tutorial (Draft Green Book) 
CCSDS 902.1-B-0, Simple Schedule Format Specification (Draft Blue Book) 
PS/EB will update the book together with SANA 
CCSDS 727.0-B-4.1, CCSDS File Delivery Protocol (CFDP) (Draft Blue Book) 
Interoperability Testing Waiting for ESA Proto activity 
CCSDS 313.0-Y-1.1, Space Assigned Numbers Authority (SANA)?Role, 
Responsibilities, Policies, and Procedures (Draft Yellow Book) waiting for 
conditions to be solved 
CCSDS 313.1-Y-0.1, CCSDS SANA Registry Management Policy (Draft Yellow 
Book) waiting for conditions to be solved 
CCSDS 313.2-Y-0, Procedures for SANA Registry Specification (Draft Yellow 
Book) waiting for conditions to be solved 
Polls with conditions not yet resolved 
Polls with conditions open 
- PS is handling the conditions raised during the poll for the 3 SANA 
books. ADs/DADs will receive soon PS' proposal to solve them 
- MS / RB are preparing the solving of the conditions set for the creation 
of the Sub-NW WG 
Update of on-line Strategic Plan / charters / Approved-Draft Project 
SEA status 
To be done by 31st Jan 2016 
MOIMS status 
Mario has delivered a file with all details. Missing DAI / Tel / CCSDS 
Secretariat updates 
CSS status 
Completed 
SLS status 
Done with the exception of Opt WG updates 
SOIS status 
Done with the exception of the goal names 
SIS status 
To be checked by NP
Project Resource Table
CMC is still working on action to deploy resources for Proto 2 in 2016 and 
2017 
Three new Projects were submitted for CMC approval. Resources are granted 
CWE Projects behind schedule
Several Projects are behind schedule. ADs to instruct WG chairs to update 
them 
ICPA
IOAG is working on the Catalogue 1 update. NP to ask IOAG to deliver 
latest updates before Cleveland 
Status of the IOAG comm assets in the SANA registry 
Nobody is doing quality control. Each Agency is responsible for the 
quality of their owned data. 
PS to send a list of known inconsistencies to NP to be addressed to IOAG 
Proc & Org YB modifications 
YB update has passed CESG ballot. CMC poll is in progress. 
Next CESG webex 
16th march 17:00 hrs CET 
AOB
Secretary Cost: 
NASA has addressed to the CMC its problem to fully fund the Secretariat 
cost from fiscal year 2017. Breakdown of the costs have been requested and 
NASA will deliver them 3 weeks prior to the meeting in Brazil 
SOIS AD stepping down 
Martin Suess is changing position within ESA/ESTEC and CCSDS tasks are not 
within the ToR of his future work. He will not participate in Cleveland 
and Rick will deputise for him. A new AD will have to be nominated by the 
CMC. 


This message and any attachments are intended for the use of the addressee 
or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in 
whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete 
it from your system.
Emails can be altered and their integrity cannot be guaranteed by the 
sender.

Please consider the environment before printing this email.
_______________________________________________
CESG mailing list
CESG at mailman.ccsds.org
http://mailman.ccsds.org/mailman/listinfo/cesg


This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/moims/attachments/20160128/1ab617fc/attachment.html>


More information about the MOIMS mailing list