[Moims-sc] Use of CCSDS Standards for Mission Operations Interoperability in the LOP-G Program
Mario.Merri at esa.int
Mario.Merri at esa.int
Fri Jul 6 11:44:44 UTC 2018
Sorry for the late forwarding, but I realised that this had not been
distributed widely to the MOIMS.
Regards,
__Mario
----- Forwarded by Mario Merri/esoc/ESA on 06/07/2018 13:42 -----
From: Mario Merri/esoc/ESA
To: "Lupisella, Mark L. (GSFC-5810)" <mark.l.lupisella at nasa.gov>,
"Schlesinger, Adam M. (JSC-XS111)" <adam.m.schlesinger at nasa.gov>, Frank De
Winne/eac/ESA at ESA, Philippe Schoonejans/estec/ESA at ESA, Ludovic
Duvet/ecsat/ESA at ESA, james.schier-1 at nasa.gov, wallace.tai at jpl.nasa.gov,
philip.e.liebrecht at nasa.gov
Cc: Michael Schmidt/esoc/ESA at ESA, Thomas Reiter/esoc/ESA at ESA,
cesg at mailman.ccsds.org, moims at mailman.ccsds.org, Michael
McKay/esoc/ESA at ESA, Andrea Accomazzo/esoc/ESA at ESA, james.afarin at nasa.gov,
Francois Allard/estec/ESA at ESA
Date: 28/05/2018 13:12
Subject: Use of CCSDS Standards for Mission Operations
Interoperability in the LOP-G Program
Dear Colleagues,
Mission operations is the program aspect that ties all systems and
components together. As such, mission operations concepts and standards
should be part of the very early planning phases of any mission. It is
recommended that the International Deep Space Interoperability Standards
document suite include a volume dedicated to mission operations
interoperability standards applicable to both space and ground segment
systems.
The Deep Space Interoperability Standards team should carefully consider
adopting standards from the broad set of operations-related standards
developed within the Mission Operations and Information Management
Services (MOIMS) Area of the Consultative Committee for Space Data Systems
(CCSDS).
MOIMS standards are dedicated to interoperability services and data
formats defining a basic set of interfaces, interactions and services
common in the Space and Ground domains. A general trend is the movement of
intelligent applications from Ground to Space and the standards are an
enabler for this movement due to their common nature and technology
abstractions.
Reasons for early inclusion of CCSDS MOIMS standards in the Deep Space
Programs include:
- Hard lessons learned in the early phases of the ISS. The lack of
upfront definition of operations standards has resulted in a very
complicated ground segment with duplication of the similar interfaces
- The set of MOIMS standards currently available includes key
standards that are commonly used in most of space missions today.
- LOP-G is already considering several related CCSDS standards for
communications and security, and the same rationale is applicable for the
use of MOIMS Standards.
- MOIMS Services focus on the interface boundaries, with minimal
invasion into the hosting systems. Therefore, they are easily usable on
new or legacy and space and ground systems.
- MOIMS Standards simplify the integration of systems (legacy and
new applications) and support heterogeneous communications protocols,
therefore facilitating and simplifying inter-agency co-operation.
- MOIMS Standards are developed internationally and approved by the
11 CCSDS space agencies. They are the technical foundation for smooth
international cooperation.
- Over time, mission operations concepts and procedure will mature
and change, driving the LOP-G system in ways not currently considered.
Mature interface and service standards can help simplify system
redirection / expansion.
- The MOIMS service framework allows easy expansion of new
capabilities as locally-defined services or as new Mission Operations (MO)
standards through CCSDS. In particular, its modular architecture enables
inclusion of new services at a very late stage of project development with
no need to redesign the already developed components/applications.
- MOIMS standards facilitate avoidance of unneeded software
developments.
The MOIMS area is very interested in providing its set of standards to the
LOP-G community. For this reason, should we identify the need of a
specific standard that is not covered by the available set, we are ready
to be flexible and, if agreed by the participating agencies, adapt the
MOIMS workplan to the LOP-G needs. Clearly, LOP-G agency staff are
welcomed to contribute to the work.
We also would like to re-mark the fact that the MOIMS includes the
?Telerobotics Working Group? that unfortunately has been dormant for a
couple of year due to lack of interest from the agencies. We think instead
that standards in this field would be critical in a multi-asset and
multi-organization set up as the LOP-G one. We would very welcome a
revived interest by space agencies boosted by the LOP-G interest in order
to re-start the work of this working group.
A whitepaper has been prepared to provide an overview of available mission
operations standards that can directly benefit large missions such as the
Lunar Orbital Platform ? Gateway. The paper has been submitted as comment
to the call made by the International Deep Space Standards group (
https://www.internationaldeepspacestandards.com/comment/, but it is not
clear if the on-line submission was successful as no positive feedback was
received) and has been posted to the public CCSDS MOIMS Site at
https://cwe.ccsds.org/moims/docs/MOIMS%20Area/LOP-G/180525%20CCSDS%20MOIMS%20Input%20to%20LOP-G%20Final.pdf
We would appreciate if you could consider our comment and pass it to
whoever may be concerned.
Best regards,
Mario Merri Brigitte
Behal
MOIMS Area Director MOIMS Deputy Area
Director
European Space Agency (ESA Centre National d'Etudes Spatiales
(CNES)
Robert Bosch Strasse 5 18 Avenue Edouard Belin
D-64293 Darmstadt, Germany F-31401 Toulouse Cedex 9, France
E-mail: Mario.Merri at esa.int E-mail: Brigitte.Behal at cnes.fr
This message is sent for information and/or discussion purposes only.
It shall neither be binding nor construed as constituting a commitment for ESA.
It is intended only for the recipient(s) named above.
It may contain proprietary information and/or protected content.
Any unauthorised disclosure, use, retention or dissemination is prohibited.
If you have received this e-mail in error, please notify the sender immediately.
ESA applies appropriate organisational measures to protect personal data.
In case of data privacy queries, please contact the ESA Data Protection Officer (dpo at esa.int).
Thank you.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/moims-sc/attachments/20180706/ca15c54b/attachment.html>
More information about the MOIMS-SC
mailing list