[Moims-dai] DRAFT: MOIMS DAI status report to June 30 2020

david at giaretta.org david at giaretta.org
Tue Jun 30 15:45:23 UTC 2020


Any comments on this status report which the Area Director requests be sent
to him every 2 months?

 


Document

Status


MB: Information Preparation to Enable Long Term Use (IPELTU)

Major updates have been made to the annexes, including the addition of more
use cases. We expect the updated version to be sent to the AD in 2-3 weeks.


MB: Open Archival Information System (OAIS) : 5y revision

The document is awaiting feedback from Peter Shames on the proposed
dispositions of his RIDS, which were sent to him 3 months ago. It is not
clear why it is taking him so long to respond.


MB: Audit and Certification of Trustworthy Digital Repository: 5y revision


The updated document should be ready in 2-3 weeks and will be submitted to
AD.


MB: Digital Archive Architecture Design Document         

Very detailed discussions have been had over the past 2 months. These have
led to a clarification and simplification of the OAIS Interoperability
Framework. A draft document is being prepared.

 

..David

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/moims-dai/attachments/20200630/f2ae7dc4/attachment.htm>


More information about the MOIMS-DAI mailing list