[Css-csts] Directive Procedure Document: Rev1
Charles J Ruggier
Charles.J.Ruggier at jpl.nasa.gov
Fri Apr 7 16:55:14 EDT 2006
Dear CSTS WG Members:
I have uploaded a revised version of the "SLE Generic Control Directive
Procedure Specification." This document is being submitted for your
review in response to Action Item 15-0206 and can be found at the CCSDS/CWE
CSS-CSTS web site:
<http://public.ccsds.org/sites/cwe/csts/default.aspx>, under Documents -
SLE Toolkit Procedures folder - SLE Generic Control_Directive_2rev1
The document has been revised to reflect the new procedures and in response
to review comments from the CSTS Interim meetings held at ESOC in
February/06. Other changes have been included for consideration in an
effort to improve the harmonization and overall efficiency of the
procedure. The major changes to the document are summarized below:
(1) The document text and UML models have been modified per new procedures
as outlined at the Atlanta and ESOC Interim meetings.
(2) The Control-Directive procedure assumes 3-phase confirmation of the
processed and executed directive: invoked request, acknowledged return, and
final confirmed return.
(3) Transfer-Data, Set and Get parameters are included as parameters
associated with the Control-Directive operation. The underlying principle
here assumes that the Control-Directive is a generic operation that
controls service production parameters (except commanding) and the
retrieval of requested data. Transfer-Data, Set and Get are considered
here to be directive-mapped parameters and not stand-alone operations.
Best Regards,
Charles Ruggier
Jet Propulsion Laboratory
Telephone: +1 818-354-1823
Fax: +1 818-393-3505
More information about the Css-csts
mailing list