[CMC E-Poll Alert] CMC Poll Results
Neil Dissinger
neild at aiaa.org
Thu Aug 24 21:45:17 EDT 2006
CMC E-Poll Identifier: CMC-P-2006-07-003: Authorization to
approve update to the Data Compression Working Group
charter
Results of CMC poll beginning 23 July 2006 and ending 21
August 2006:
ADOPT: 3 (50%) (DLR, INPE, JAXA)
ADOPT PROVISIONALLY: 3 (50%) (BNSC, CNES,
NASA)
REJECT: 0 (0%)
REJECT WITH COMMENTS: 0 (0%)
BNSC: I agree with Adrian's comments that we need a
review of why the slippage was reported so late in the day
in order to prevent a repetition.
CNES: [Response added after poll closure, per e-mail
date 22 Aug 2006]
Please clarify how the result of the CMC e-poll
A-2006-03-001 closed on April 14, 2006 will be taken into
account by the area and which interactions this may have
with the activities planned in the new DC Charter, at the
technical, schedule and ressource levels.
DLR: [Response changed from "reject with comments"
per e-mail dated 10 Aug 2006 . Original comments:]
- please finalze outstanding work.
- for new work items define a BOF to collect these new
work items and define a workplan for the next 3 years.
INPE: Concerning the document CCSDS 121.0-B-1, which
currently corresponds to Standard ISO 15887 and,
concerning document CCSDS 120.0-G-1, INPE wishes to
observe that both mentioned documents resulted in a
Brazilian ABNT National Standard, under number NBR 15063
generated by ABNT/CB08/SC01/CE06, in May 2004. The NBR
15063 standard document is naturally composed by an
equivalent translation of the mentioned CCSDS/ISO
Recommendation/Standard while also contaning as one of its
appendices the equivalent translation of document CCSDS
120.0-G-1. INPE wishes to recommend to CCSDS CMC that the
CCSDS Data Compression Working Group may seriously
consider the review of document CCSDS 121.0-B-1 Lossless
Data Compression for a possible update that would clearly
indicate in what instances this lossless algorithm could
be tailored for, in the realm of space missions. Possibly,
this desired, proposed action, at discretion of the
mentioned WG, may also imply in the review of document
CCSDS 120.0-G-1 in what may be considered to be pertinent.
Unless it may be found by the pertinent WG that CCSDS
120.0-G-1 should better be retired.
NASA: The principal changes appear to be the
introduction of a 1-year slip in the production of a Green
Book and reference software. There's probably very little
that can be done at this point to improve the schedule;
however an analysis should be performed and a brief
summary report to the CMC should be issued which defines
exactly *why* the schedule slipped and why it took so long
to update the charter to reflect the slippage. Without
this kind of information, it will be difficult to manage
future schedule-driven activities.
Results are based on responses from 6 out of 10 members
(60%).
No response was received from the following Agencies:
ASI
CSA
ESA
FSA
Secretariat Interpretation of Results: Adopted
Provisionally
Resulting CMC Resolution: TBD
Inferred Secretariat Action: Pending Disposition of
Provisions
More information about the CMC-exec
mailing list