[CESG] CESG-P-2022-04-001 Approval to release CCSDS 901.3-R-1, Functional Resource Model (Red Book, Issue 1) for CCSDS Agency review
CCSDS Secretariat
thomas.gannett at tgannett.net
Wed Aug 10 14:27:42 UTC 2022
Dear CESG Members,
Conditions for approval to release CCSDS 901.3-R-1, Functional
Resource Model (Red Book, Issue 1) for CCSDS Agency review have
either been explicitly disposed to the satisfaction of the AD(s) who
voted to approve with conditions or have been deemed disposed due to
lack of response within the period of time allowed in CCSDS
A02.1-Y-4, Organization and Processes for the Consultative Committee
for Space Data Systems. The Secretariat will now proceed with CMC
polling to authorize publication.
-------------- next part --------------
From: Ignacio.Aguilar.Sanchez at esa.int
Sent: Wednesday, August 10, 2022 1:53 AM
To: Thomas Gannett
Cc: Erik Barkley
Subject: RE: Results of CESG Polls closing 12 May 2022
Dear Tom,
I am back from leave this week.
Please go ahead as you propose.
Kind regards,
Ignacio
Ignacio Aguilar Sánchez
Communication Systems Engineer
Electrical Engineering Department
European Space Research and Technology Centre
Keplerlaan 1, PO Box 299, 2200 AG Noordwijk, The Netherlands
Tel. (31) 71 565 5695
Fax (31) 71 565 5418
Email: ignacio.aguilar.sanchez at esa.int
www.esa.int
From: "Thomas Gannett" <thomas.gannett at tgannett.net>
To: <Ignacio.Aguilar.Sanchez at esa.int>
Cc: "Erik Barkley" <Erik.J.Barkley at jpl.nasa.gov>
Date: 09/08/2022 18:30
Subject: RE: Results of CESG Polls closing 12 May 2022
Dear Ignacio:
I do not have a record of resolution of your conditions on the poll below.
I propose to make all the editorial changes you requested.
Please respond by return email if my proposed remedy satisfies you
conditions.
Best regards,
Tom
Logothete, L.L.C.
thomas.gannett at tgannett.net
+1 443 472 0805
-----Original Message-----
From: CCSDS Secretariat [mailto:thomas.gannett at tgannett.net]
Sent: Friday, May 13, 2022 5:31 PM
To: cesg-all at mailman.ccsds.org
Subject: Results of CESG Polls closing 12 May 2022
CESG E-Poll Identifier: CESG-P-2022-04-001
Approval to release CCSDS 901.3-R-1, Functional
Resource Model (Red Book, Issue 1) for CCSDS Agency review
Results of CESG poll beginning 28 April 2022 and ending 12 May 2022:
Abstain: 0 (0%)
Approve Unconditionally: 2 (50%) (Barkley, Wilmot)
Approve with Conditions: 2 (50%) (Merri, Aguilar Sanchez)
Disapprove with Comment: 0 (0%)
CONDITIONS/COMMENTS:
Mario Merri (Approve with Conditions):
1) Section 1.3 "Scope" states that the scope is
limited to IOAG service cat 1 and 2.
Then Section 2.2.1 "FUNCTIONAL RESOURCES AS
ABSTRACTIONS OF REAL RESOURCES" reads:
"FRs are abstract representations of the
functionality needed to provide space
communication and tracking services, defined at a
level of granularity sufficient to specify the
configuration parameters, monitored parameters,
and notifiable events associated with that functionality.
FRs exist to represent such information as it
applies to a cross support interface. If a
processing function does not have unique
monitored parameters, notifiable events, or any
configuration parameters that need to be set
(possibly through configuration profiles),
queried, or reconfigured (via real-time control
directives), then it does not have an FR to
represent it. It should be noted that only one of
these facets needs to be present in order for a
function to need to be represented by an FR."
It should be clarified in the text that the FRs
shall be limited to hw/sw that is immediately and
directly related to communication and shall not
be used for abstract representation of other
devices onboard or on the ground, e.g. a Camera
or a Gyro.... for such devices MO services should
be the prime choice for abstract representation
of the interface. This is consistent with the so called "London agreement".
2) It should be also clarified in the text
(Section 1.3 Scope?) that, when it goes on-board
even for the RF elements, the aspects of TM/TC
and operations in general should be handled
through MO M&C services rather than using FRM for
monitored parameters, notifiable events, or any
configuration of those devices. This is
consistent with CCSDS 371.0-G-1 APPLICATION AND SUPPORT LAYER ARCHITECTURE
Ignacio Aguilar Sanchez (Approve with Conditions):
Positively impressed with the organisation, depth
and detail of this draft standard. Will review it
carefully during Agency Review. Nevertheless, a
couple of minor editorials (will not use the PID form):
-Ref [6]: There is a very recent issue 4 (April 2022);
- Page 2-5, paragraph b): the terms 'channel bits' shall be replaced by
'symbols'; on the next sentence the term 'bits' shall be replaced by
'symbols';
- Page 2-5, paragraph c): the term 'bits' shall be replaced by 'symbols'.
Jonathan Wilmot (Approve
Unconditionally): Document is really for agency
review. May submit comments during agency review process.
Total Respondents: 4
No response was received from the following Area(s):
SEA
SIS
SECRETARIAT INTERPRETATION OF RESULTS: Approved with Conditions
PROPOSED SECRETARIAT ACTION: Generate CMC poll after conditions
have been addressed
This message is intended only for the recipient(s) named above. It may
contain proprietary information and/or
protected content. Any unauthorised disclosure, use, retention or
dissemination is prohibited. If you have received
this e-mail in error, please notify the sender immediately. ESA applies
appropriate organisational measures to protect
personal data, in case of data privacy queries, please contact the ESA Data
Protection Officer (dpo at esa.int).
More information about the CESG
mailing list