Hi Nestor,

I already replied about the SecWG NWI.  Until I get an updated chart from them with resource loads I would rather not include it.  I do not thnk that they are ready for that.

On the DAI chart, you can take it out if you feel you need to, I would prefer to leave it in and I will, in any event, speak to the concern.  To put it simply, the DAI appears to have taken on a project for which they do not have the required expertise.  The project is a complicated systems architecture task that requires specification of a layered systems architecture, functional decomposition, application and interface protocols, and dataset and information models.  Their team has information architects (now), data modeling, and data process expertise, but no one who has the requisite systems architecture or protocols background.  That is evidenced by the fact that Roger and I prepared materials for them discussing these issues and presented them 6 months ago, but the materials that they are still showing have not changed one whit in this regard in the last 1 / 2 year.  Add to this the fact that the last two times we discussed this with them they suggested that I, or Roger, should join them to bring the needed expertise.  I think that they are aware that they have a problem, but they have done nothing about the fundamental problem.

It's a little like needing to build a house, but only having a crew of painters and interior decorators. An architect, builders, plumbers, and electricians are called for, but they do not have any on the team.  Giving them more time is not really going to help that.

I think that the CMC should be made aware that this WG is at present not staffed with people who have the expertise required to get the job done expeditiously.  If the WG does not act to remedy this, and if the CMC does not provide the resources, they could all waste a lot of time and not arrive at a useful result.

Best regards, Peter



From: Nestor Peccia <Nestor.Peccia at esa.int>
Date: Sunday, November 12, 2017 at 2:43 AM
To: Peter Shames <peter.m.shames at jpl.nasa.gov>
Cc: Howie Weiss <Howard.Weiss at parsons.com>
Subject: Re: Updated SEA report to CMC materials

Peter

Thanks for the SEA Report
2 observations
1.       I took out the chart on DAI Architecture as discussed during the CESG meeting
2.       I will not include in the general CESG chart for NWI in the next 6 months the new proposed SEC WG NWIs because they are all TBD (unless I get estimated resources and Agencies deploying the resources).
Exception could be for 350.6-G-1 Space Missions Key Management Concept (Nov 2011) if we can indicate the Agency keen to deploy resources
I copy Howie (in particular for point 2) to shorten the timing
Area and WG name

CCSDS Ref Nr

Activity
(RB, Pink, Draft. Update)

Document Title

Target Start / Publication Date

Resources Needed (total, Editor, Proto 1, Proto 2)

Comments
Rationale
What if not started?

SEA SEC

350.6-G-1<https://public.ccsds.org/Pubs/350x6g1.pdf>

Update

Space Missions Key Management Concept (Nov 2011)

Start    20/06/2017
End   10/12/2018

2017

2 WMs for  GB

No Prot 1

No Prot 2

Project not yet agreed. Revise GB to include new material.

2018

2 WMs for  GB

SEA SEC

352.0-B-1<https://public.ccsds.org/Pubs/352x0b1.pdf>

Update

CCSDS Cryptographic Algorithms (Nov 2012)

Start    TBD
End   TBD

2017

TBD

TBD

TBD

Project not yet agreed.

2018

TBD

TBD

TBD

2019

TBD

TBD

TBD

SEA SEC

350.8-G-1<https://public.ccsds.org/Pubs/350x8g1.pdf>

Update

Information Security Glossary of Terms (Nov 2012)

Start    TBD
End   TBD

2017

TBD

TBD

TBD

Project not yet agreed. Need to update SANA Glossary.

2018

TBD

TBD

TBD

2019

TBD

TBD

TBD

SEA SEC

350.7-G-1<https://public.ccsds.org/Pubs/350x7g1.pdf>

Update

Security Guide for Mission Planners
(Oct 2011)

Start    TBD
End   TBD

2017

TBD

TBD

TBD

Project not yet agreed.

2018

TBD

TBD

TBD


2019

TBD

TBD

TBD



ciao
nestor

This message and any attachments are intended for the use of the addressee or addressees only.

The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its

content is not permitted.

If you received this message in error, please notify the sender and delete it from your system.

Emails can be altered and their integrity cannot be guaranteed by the sender.



Please consider the environment before printing this email.


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/cesg/attachments/20171112/835b6339/attachment.html>


More information about the CESG mailing list