[CESG] RE: Projects for CFDP Blue Book / was: Draft CFDP Pink Sheet
supporting an optional 'finished' PDU in class-1
Gian.Paolo.Calzolari at esa.int
Gian.Paolo.Calzolari at esa.int
Tue Jul 23 05:44:39 EDT 2013
OK, Keith, let's assume that the sharing between SIS-DTN and SIS-CFDP
working on the same book is OK with SIS-DTN producing Issue 5 (*) and
SIS-CFDP eventually producing issue 6 (#).
It remains the point of expressing this properly to all the approving
communities (i.e. CESG now, and eventually CMC; and with respect to CMC is
also mandatory the CWE Project linked to WG creation as the CWE Project is
the only place where resources are identified).
Therefore the correct relationship between the two WGs and Projects has to
be clear in both the SIS-CFDP Charter and in the (to be added) CWE Project
for CFDP Book Issue 6.
Let's also assume that pink sheets go out quickly. Even with a fast
agency review, is publication before Fall 2013 possible?
If not, does it make sense to approve now creation of SIS-CFDP for San
Antonio (also considering that there is large overlap in the actual people
involved in SIS-DTN for the specific CWE Project) .
Note that I am not against the SIS-CFDP WG, but I would like to avoid
seeing CMC blaming CESG for missing information etc.
Moreover, I would really appreciate listening to the opinion of other
CESGers.
Best Regards
Gian Paolo
(*) formally speaking, as SIS-DTN will produce Issue 5 of the Book,
SIS-CFDP cannot claim they will do the 5 years review as the Issue 5 will
be dated sometimes in 2014 :o)
(#) It is likely that Issue 6 would be dated 1 year or a little more from
Issue 5, and in the past we tried to avoid updating docs too frequently if
not strictly needed.
From:
"Scott, Keith L." <kscott at mitre.org>
To:
"Gian.Paolo.Calzolari at esa.int" <Gian.Paolo.Calzolari at esa.int>
Cc:
"CCSDS Engineering Steering Group - CESG Exec (cesg at mailman.ccsds.org)"
<cesg at mailman.ccsds.org>
Date:
23/07/2013 00:30
Subject:
RE: Projects for CFDP Blue Book / was: Draft CFDP Pink Sheet supporting an
optional 'finished' PDU in class-1
Gian-Paolo,
You are correct, except (as detailed below) I don?t think there?s a danger
of having ?concurrent / possibly conflicting changes? to CFDP.
I think #2 (the pink sheet) can be done way before the due date, as the
draft modification includes only a very minor modification of the existing
protocol. My hope is to have the pink sheet out for review within a month
or so. This would allow the pink sheet to be completed before the CFDP
update WG gets under way.
Scott provided some draft project material for the CFDP update projects
that I?ve also entered into the CCSDS Update WG Framework.
I don?t think there?s any danger of concurrent updates / duplication of
effort since:
1) I expect the Pink Sheet to be done before the CFDP Update WG gets
well under-way
2) The community of interested parties is small enough that the Pink
Sheet material, even if not completed by the time the CFDP update WG gets
going, can easily be made known to the CFDP update WG.
--keith
From: Gian.Paolo.Calzolari at esa.int [mailto:Gian.Paolo.Calzolari at esa.int]
Sent: Monday, July 22, 2013 8:43 AM
To: Scott, Keith L.
Cc: CCSDS Engineering Steering Group - CESG Exec (cesg at mailman.ccsds.org)
Subject: Projects for CFDP Blue Book / was: Draft CFDP Pink Sheet
supporting an optional 'finished' PDU in class-1
Keith,
let me understand the situation.
1) The latest version of the CFDP Blue Book is Issue 4 dated January 2007
(see http://public.ccsds.org/publications/archive/727x0b4.pdf )
2) SIS-DTN is currently running a project titled "CFDP-over-BP Pink Sheet"
for producing Issue 5 of the CFDP Blue Book.
See http://cwe.ccsds.org/fm/Lists/Projects/DispForm.aspx?ID=199
This project is supposed to finish the work in August 2014.
3) It is proposed to create (resurrect) a SIS-CFDP WG to "accomplish the
mandated 5-year reconfirmation review of the CCSDS File Delivery Protocol
(CFDP) Blue Book"; i.e. to work on CFDP Blue Book Issue 4.
4) The SIS-CFDP has currently no linked/proposed CWE Project so it is not
possible to know when it will start work and will it will finish it (e.g.
in parallel with SIS-DTN or after SIS-DTN issues CFDO #5?). ==> A CWE
project linked to SIS-CFDP shall be created also to allow CMC to approve
relevant resource needs.
It appears to me that with this situation we have a chance of having two
WGs working on the same issue of the book (i.e. issue 4) unless SIS-CFDP
will wait for Issue 5 being finalized bu SIS-DTN.
Sorry, but I am just puzzled.
Can you shed some more light?
Gian Paolo
This message and any attachments are intended for the use of the addressee
or addressees only. The unauthorised disclosure, use, dissemination or
copying (either in whole or in part) of its content is not permitted. If
you received this message in error, please notify the sender and delete it
from your system. Emails can be altered and their integrity cannot be
guaranteed by the sender.
Please consider the environment before printing this email.
This message and any attachments are intended for the use of the addressee or addressees only. The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its content is not permitted. If you received this message in error, please notify the sender and delete it from your system. Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.ccsds.org/pipermail/cesg/attachments/20130723/b09729e2/attachment.html
More information about the CESG
mailing list