[CESG] RE: [SLS] Resolution SLS-R-2011-02-001, 131.0-P-1.2 TM Synchronization and Channel Coding Pink Book

Hooke, Adrian J (9000) adrian.j.hooke at jpl.nasa.gov
Thu Feb 17 09:20:58 EST 2011


Gian Paolo: only the first issue of Red/Pink books requires CESG approval prior to Agency review. Consequently, no new CESG poll is required, none will be conducted, and the Secretariat will therefore initiate the second review of the Pink Book immediately according to normal procedures.

Best regards
Adrian

Adrian J. Hooke
Chairman, CCSDS Engineering Steering Group (CESG)
Space Operations Mission Directorate
NASA Headquarters
Washington DC  20024-3210

From: sls-bounces at mailman.ccsds.org [mailto:sls-bounces at mailman.ccsds.org] On Behalf Of Gian.Paolo.Calzolari at esa.int
Sent: Thursday, February 17, 2011 3:35 AM
To: CESG -- CCSDS-Engineering Steering Group
Cc: SLS - Space Link Services Area
Subject: [SLS] Resolution SLS-R-2011-02-001, 131.0-P-1.2 TM Synchronization and Channel Coding Pink Book


SLS-R-2011-02-001

The Space Link services Area,

CONSIDERING that the Coding & Synchronization Working Group (SLS-C&S) has reached consensus on
- producing an updated version of the TM Synchronization and Channel Coding Pink Book 131.0 and
- requesting a second Agency review to be performed.

RECOGNIZING that CESG requested that:
- A clean copy of the Red Book (reflecting all RID dispositions from last Agency review) will be produced and sent to the document editors, who will identify technical changes.
- These  changes will be "flagged" and the "flagged" Red Book will be sent out for final Agency review with instructions that the review is limited only to consideration of the flagged items

and that SLS Area Director announced to issue a related resolution to CESG

RESOLVES to request that a second Agency review be performed for the TM Synchronization and Channel Coding Pink Book 131.0-P-1.2,

RECOMMENDS that CESG approves this resolution, and finally

REQUESTS that a CESG poll be conducted to accomplish this.

------------------------------------------

A pdf version of this resolution is available in CWE at http://cwe.ccsds.org/sls/docs/SLS%20Area/SLS%20Resolutions%202011/SLS-R-2011-02-001.v1.pdf

A pdf version of the pink book produced in agreement with the CCSDS Editor (Tom Gannett) is available in CWE at
http://cwe.ccsds.org/sls/docs/SLS-CandS/Meeting%20Materials/2011/201101.WinterMaterial/131x0p12%5BPre-release%202011-2-14%5D.pdf

Best regards

Gian Paolo Calzolari
SLS Area Director

____________________________________________

Gian Paolo Calzolari
Systems Engineer, OPS-OT

European Space Agency ESA/ESOC
Robert Bosch Str. 5
D-64293-Darmstadt
Tel +49-6151-902913 fax +49-6151-902962
http://www.esa.int/esoc    Email: Gian.Paolo.Calzolari[at]esa.int
[replace [at] with @ for the correct e-mail address]
____________________________________________
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.ccsds.org/pipermail/cesg/attachments/20110217/54b10f53/attachment.htm


More information about the CESG mailing list