[Cesg-all] CESG 2016 webex #2: Notes16th March 2016

Shames, Peter M (312B) peter.m.shames at jpl.nasa.gov
Sun Mar 20 18:06:17 UTC 2016


Nestor, et al,

At the end of the week we had a NASA tag-up session and I learned that the contract with Tom Gannett has been agreed and is being signed.  We all expect that he will be at Cleveland for the working meetings.

The document processing priorities are usually first-in, first-out, but in groups ordered by color: Blue, Magenta, Green, Yellow.  Since there is quite a backlog of documents in the queue I suggested that we might ask if the CESG wished to prioritize them further.  The Secretariat is open to suggestion on this topic as to how to proceed to work off the backlog.

Regards, Peter


From: <cesg-all-bounces at mailman.ccsds.org<mailto:cesg-all-bounces at mailman.ccsds.org>> on behalf of Nestor Peccia <Nestor.Peccia at esa.int<mailto:Nestor.Peccia at esa.int>>
Date: Sunday, March 20, 2016 at 8:49 AM
To: CCSDS Engineering Steering Group - CESG All <cesg-all at mailman.ccsds.org<mailto:cesg-all at mailman.ccsds.org>>
Cc: CMC <CMC at mailman.ccsds.org<mailto:CMC at mailman.ccsds.org>>
Subject: [Cesg-all] CESG 2016 webex #2: Notes16th March 2016

Dear all,
Notes attached.
ciao
nestor
===================================================

  *   Actions status
CMC-A-2014-11-01 Peter Shames was requested to draft a formal memorandum from CCSDS to ISO/TC 20/SC14 (Space Systems and Operations) to describe the coordination needed on RASDS. Ensure that SC13 is referenced in the draft memorandum.
Action: Peter Shames Due Date: Spring 2016 CMC Meeting   Status: Open
  *   Document queue status
No feedback from Tom due to the NASA Secretariat Contract's transition period
CCSDS 766.2-R-0, Voice and Audio Communications (Proposed Red Book for Agency Review) Poll issued
CCSDS 911.1-B-3.1, Space Link Extension—Return All Frames Service Specification (Draft Blue Book) Poll to be issued soon
CCSDS 911.2-B-2.1, Space Link Extension—Return Channel Frames Service Specification (Draft Blue Book) Poll to be issued soon
CCSDS 911.5-B-2.1, Space Link Extension—Return Operational Control Fields Service Specification (Draft Blue Book) Poll to be issued soon
CCSDS 912.1-B-3.1, Space Link Extension—Forward CLTU Service Specification (Draft Blue Book) Poll to be issued soon
CCSDS 912.3-B-2.1, Space Link Extension—Forward Space Packet Service Specification (Draft Blue Book) Poll to be issued soon
CCSDS 130.12-G-0, CCSDS Protocols over DVB-S2—Summary of Definition, Implementation and Performance (Draft Green Book) It will be ready by end Feb 2016
CCSDS 651.2-G-0, Producer-Archive Interface Specification (PAIS)—A Tutorial (Draft Green Book) To be done once the books mentioned above are completed
CCSDS 902.1-B-0, Simple Schedule Format Specification (Draft Blue Book) PS/EB will update the book together with SANA
CCSDS 727.0-B-4.1, CCSDS File Delivery Protocol (CFDP) (Draft Blue Book) Interoperability Testing Waiting for ESA Proto activity
CCSDS 313.0-Y-1.1, Space Assigned Numbers Authority (SANA)—Role, Responsibilities, Policies, and Procedures (Draft Yellow Book) waiting for conditions to be solved
CCSDS 313.1-Y-0.1, CCSDS SANA Registry Management Policy (Draft Yellow Book) waiting for conditions to be solved
CCSDS 313.2-Y-0, Procedures for SANA Registry Specification (Draft Yellow Book) waiting for conditions to be solved
  *   Polls with conditions not yet resolved
All 3 SANA books conditions have been solved. Updated books were passed by PS to TG
  *   Project Resource Table - Missing Proto 2 resources
Following Projects (to be completed in 2016-2017) are missing Proto 2 resources
MOIMS Area
     *   Attitude Data Message (ADM) 5 Year Review Revision
     *   Navigation Hardware Message
     *   Pointing Requests Message
     *   Spacecraft Maneuver Message (SMM)
     *   Telerobotic Standard
     *   Mission Operations - Message Abstraction Layer Binding to HTTP Transport and XML Encoding
     *   Mission Operations - Message Abstraction Layer Binding to TCP/IP Transport and Split Binary Encoding
     *   Mission Operations - Message Abstraction Layer Binding to ZeroMQ Transport and CNES Binary Encoding
     *   Mission Operations - Mission Data Product Distribution Services
SIS Area
     *   Bundle Security Protocol for CCSDS
  *   CWE Projects behind schedule
2 DAI, 3 SM&C, 1 CSTS, 2 APP WG Projects are behind schedule. They have to be updated during the next Technical meeting at Cleveland
  *   ICPA Status
IOAG updated its need date for the following Projects (i.e. aligning them to current CCSDS publication dates)
     *   SM file Transfer
     *   CSTS Monitored Data
     *   DTN BSP
  *   CESG – IT Support Face to face meeting on 11th April 2016 - Preparation.
ADs/DADs to prepare a chart including IT support issues to be discussed with Brian Oliver during the CESG meeting (11th April pm)
  *   CESG Agenda points for meeting on 11th April
     *   Area presentations(am)
     *   Updated IOAG Service Catalogue 1
     *   IOAG Preferred Coding and Modulation Schemes
     *   Secretariat Resources
     *   IT Support - CESG face-to-face meeting
     *   Registry Creation (EB)
     *   Could interoperability Test (GM)
  *   AOB
DAI WG decided to exceptionally not to meet at Cleveland, but there will be an US DAI meeting at GSFC (with the majority of participants living close to Goddard) after the talk from Vint Cerf on long term data preservation.
Telerobotics WG will not meet. D. Mittman has changed work and will not support anymore the activity. GB is in final status except the DLR RIDs. A way forward will be to implement the simple RIDs and leave the most complicated ones for a second issue
SEA SAWG cross area meeting with SOIS and MOIMS is planned on Friday 8th April 10:30 - 12:30 hrs

This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://mailman.ccsds.org/pipermail/cesg-all/attachments/20160320/0e12137e/attachment.html>


More information about the CESG-All mailing list