<html><head><meta http-equiv="content-type" content="text/html; charset=utf-8"></head><body dir="auto"><div>Info</div><div><br><br>Sent from my iPhone</div><div><br>Begin forwarded message:<br><br></div><blockquote type="cite"><div><b>From:</b> <a href="mailto:Nestor.Peccia@esa.int">Nestor.Peccia@esa.int</a><br><b>Date:</b> 3 Nov 2014 10:17:06 GMT+1<br><b>To:</b> <a href="mailto:Gian.Paolo.Calzolari@esa.int">Gian.Paolo.Calzolari@esa.int</a>,"Moury Gilles" <<a href="mailto:Gilles.Moury@cnes.fr">Gilles.Moury@cnes.fr</a>>,<a href="mailto:Enrico.Vassallo@esa.int">Enrico.Vassallo@esa.int</a>, <a href="mailto:Massimo.Bertinelli@esa.int">Massimo.Bertinelli@esa.int</a>,<a href="mailto:Aaron.B.Kiely@jpl.nasa.gov">Aaron.B.Kiely@jpl.nasa.gov</a>,"Kazz, Greg J \(313B\)" <<a href="mailto:greg.j.kazz@jpl.nasa.gov">greg.j.kazz@jpl.nasa.gov</a>>, <a href="mailto:Klaus-Juergen.Schulz@esa.int">Klaus-Juergen.Schulz@esa.int</a>,<a href="mailto:Bernard.L.Edwards@nasa.gov">Bernard.L.Edwards@nasa.gov</a><br><b>Cc:</b> <a href="mailto:cmc-bounces@mailman.ccsds.org">cmc-bounces@mailman.ccsds.org</a>,<a href="mailto:cesg@mailman.ccsds.org">cesg@mailman.ccsds.org</a><br><b>Subject:</b> <b>[CESG] SLS Area: Goals / Project Checks needed in the WGs</b><br><br></div></blockquote><blockquote type="cite"><div>
<font size="2" face="sans-serif">Dear all,</font>
<br>
<br><font size="2" face="sans-serif">As the CESG and CMC will review the
current Strategic Plan during our planned joint meeting at London, it is
recommended to</font>
<ul>
<li><font size="2" face="sans-serif">check the Area goals and update if needed
(</font><a href="http://cwe.ccsds.org/fm/sp/default.aspx"><font size="3" color="blue"><u>http://cwe.ccsds.org/fm/sp/default.aspx</u></font></a><font size="2" face="sans-serif">)</font>
</li><li><font size="2" face="sans-serif">check the links wrt published books
and update if needed (</font><a href="http://cwe.ccsds.org/fm/sp/default.aspx"><font size="3" color="blue"><u>http://cwe.ccsds.org/fm/sp/default.aspx</u></font></a><font size="2" face="sans-serif">)</font>
</li><li><font size="2" face="sans-serif">cross check the schedule of our current
books under production and update if needed</font>
</li><li><font size="2" face="sans-serif">include the future work as CWE Projects
with a start date (realistic please) in the future </font></li></ul>
<br><font size="2" face="sans-serif">ADs have edit permission to the CWE
Strategic Plan (</font><a href="http://cwe.ccsds.org/fm/sp/default.aspx"><font size="3" color="blue"><u>http://cwe.ccsds.org/fm/sp/default.aspx</u></font></a><font size="2" face="sans-serif">),
and they shall check (co-ordinating with the related WG Chair) and update</font>
<br><font size="2" face="sans-serif">in particular</font>
<br>
<br><font size="2" face="sans-serif"><b><u>RFM WG</u></b></font>
<ol>
<li value="1"><font size="2" face="sans-serif">Evolution of RFM recommendations
BB </font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date ?</font>
</li><li value="2"><font size="2" face="sans-serif">Planetary Communications System
GB </font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date ?</font>
</li><li value="3"><font size="2" face="sans-serif">GMSK Telemetry and PN Ranging
GB </font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font></li></ol>
<br><font size="2" face="sans-serif">Future Work</font>
<ol>
<li value="1"><font size="2" face="sans-serif">RFM Part 1 with modulation scheme
for 26 Ghz</font><font size="2" color="red" face="sans-serif">
Include Project in CWE with realistic start date in
the future (resources?)</font>
</li><li value="2"><font size="2" face="sans-serif">RFM Part 1 with high rate TM
and ranging</font><font size="2" color="red" face="sans-serif">
Include Project
in CWE with realistic start date in the future (resources?)</font>
</li><li value="3"><font size="2" face="sans-serif">Prox 1 SLP 5 yr review</font><font size="2" color="red" face="sans-serif">
Include
Project in CWE with realistic start date in the future (resources?)</font>
</li><li value="4"><font size="2" face="sans-serif">RFM Part 1 with MPSA</font><font size="2" color="red" face="sans-serif">
Include
Project in CWE with realistic start date in the future (resources?)</font>
</li><li value="5"><font size="2" face="sans-serif">RFM Part 1with higher order
modulations</font><font size="2" color="red" face="sans-serif">
Include Project
in CWE with realistic start date in the future (resources?)</font></li></ol><font size="2" face="sans-serif">No
more standards foreseen after 2017
</font><font size="2" color="red" face="sans-serif">
Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font>
<br>
<br><font size="2" face="sans-serif"><b><u>C&S WG</u></b>
</font><font size="2" color="red" face="sans-serif">
</font>
<ol>
<li value="1"><font size="2" face="sans-serif">Next Generation Uplink Coding
BB </font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date ?</font>
</li><li value="2"><font size="2" face="sans-serif">Short (64, 128, 256 bit ) LDPC
codes for uplink OB </font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
</li><li value="3"><font size="2" face="sans-serif">TM Channel Coding for DVB-S2,
GB </font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date ?</font>
</li><li value="4"><font size="2" face="sans-serif">TM Channel Coding for SCCC,
GB</font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include new estimated completion
date ?</font>
</li><li value="5"><font size="2" face="sans-serif">Update TM channel coding with
LDPC slicing BB </font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
</li><li value="6"><font size="2" face="sans-serif">VCM Systems for CCSDS
MB </font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date ?</font></li></ol>
<br><font size="2" face="sans-serif">Future Work</font>
<ol>
<li value="1"><font size="2" face="sans-serif">ACM Systems for CCSDS MB
</font><font size="2" color="red" face="sans-serif">
Include Project in CWE with realistic
start date in the future (resources?)</font>
</li><li value="2"><font size="2" face="sans-serif">Erasure Coorecting codes for
low SN ratio BB </font><font size="2" color="red" face="sans-serif">Include
Project in CWE with realistic start date in the future (resources?)</font></li></ol>
<br><font size="2" face="sans-serif"> <b><u>MHDC WG</u></b></font>
<ol>
<li value="1"><font size="2" face="sans-serif"> Image Data Compression,
Issue 2 BB </font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date (resources?)?</font>
</li><li value="2"><font size="2" face="sans-serif">Lossless MHIC GB
</font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include new
estimated completion date (resources?)?</font>
</li><li value="3"><font size="2" face="sans-serif">Spectral Pre-Processing Transform
for MHIC BB </font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date (resources?)?</font></li></ol><font size="2" face="sans-serif">No
more standards foreseen after 2016
</font><font size="2" color="red" face="sans-serif">
Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font>
<br>
<br><font size="2" color="red" face="sans-serif"> </font><font size="2" face="sans-serif"><b>SLP
WG</b></font>
<ol>
<li value="1"><font size="2" face="sans-serif">AOS SDLP 5-year Review + SDLS
Rqmt BB </font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date (resources?)?</font>
</li><li value="2"><font size="2" face="sans-serif">Next Generation SDLP BB
</font><font size="2" color="red" face="sans-serif">
Insert realistic start date in the future
(resources?)</font>
</li><li value="3"><font size="2" face="sans-serif">Next Generation SDLP GB
</font><font size="2" color="red" face="sans-serif">
Insert realistic start date in the future
(resources?)</font>
</li><li value="4"><font size="2" face="sans-serif">SDLP GB
</font><font size="2" color="red" face="sans-serif">
Insert realistic start date in the future (resources?)</font>
</li><li value="5"><font size="2" face="sans-serif">TC SDLP Issue 3: SDLS Rqmt BB
</font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date (resources?)?</font>
</li><li value="6"><font size="2" face="sans-serif">TM SDLPl 5-year Review + SDLS
Rqmt BB </font><font size="2" color="red" face="sans-serif">
Is Schedule realistic ? If not, include
new estimated completion date (resources?)?</font></li></ol>
<br><font size="2" face="sans-serif">Future Work</font>
<ol>
<li value="1"><font size="2" face="sans-serif">Prox-1 SLP Data Link Layer 5
yr review BB </font><font size="2" color="red" face="sans-serif">Include
Project in CWE with realistic start date in the future (resources?)</font></li></ol><font size="2" face="sans-serif">No
more standards foreseen after 2018
</font><font size="2" color="red" face="sans-serif">
Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font>
<br><font size="2" face="sans-serif"> </font>
<br><font size="2" face="sans-serif"><b>SDL Security WG</b></font>
<ol>
<li value="1"><font size="2" face="sans-serif">SDL Security (SDLS) extended
procedures BB </font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
</li><li value="2"><font size="2" face="sans-serif">SDL Security Ops Concept Issue
1 GB </font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
</li><li value="3"><font size="2" face="sans-serif">SDL Security Ops Concept Issue
2 GB </font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
</li><li value="4"><font size="2" face="sans-serif">SDL Security Protocol BB
</font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font></li></ol><font size="2" face="sans-serif">No
more standards foreseen after 2017
</font><font size="2" color="red" face="sans-serif">
Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font><font size="2" face="sans-serif">
</font>
<br>
<br><font size="2" face="sans-serif"><b>Optical WG</b></font>
<br><font size="2" face="sans-serif">Coding & Synchronization BB
</font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<br><font size="2" face="sans-serif">Concepts and Terminologies GB
</font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font><font size="2" face="sans-serif">
</font>
<br><font size="2" face="sans-serif">Physical Layer BB
</font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<br><font size="2" face="sans-serif">RT Weather and Atmospheric Characteriz.
Data GB </font><font size="2" color="red" face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<br><font size="2" face="sans-serif">No more standards foreseen after 2018
</font><font size="2" color="red" face="sans-serif">
Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font>
<br>
<br><font size="2" face="sans-serif">ciao</font>
<br><font size="2" face="sans-serif">nestor</font><pre>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
</pre><pre>_______________________________________________
CESG mailing list
<a href="mailto:CESG@mailman.ccsds.org">CESG@mailman.ccsds.org</a>
<a href="http://mailman.ccsds.org/mailman/listinfo/cesg">http://mailman.ccsds.org/mailman/listinfo/cesg</a>
</pre></div></blockquote><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
</PRE></body></html>