<font size=2 face="sans-serif">Dear Gilles, all,</font>
<br>
<br><font size=2 face="sans-serif">Please find attached the version 1.5
of the Extended Procedures. I am really sorry I was not able to do this
earlier but I had a rather difficult summer due to personal issues and
a launch that I had to support just now (Sentinel 5p). I will try to also
work on the EP Green Book action I have but I cannot make any promises.</font>
<br>
<br><font size=2 face="sans-serif">Gilles, you would need to still update
the FSR part.</font>
<br>
<ul>
<li><font size=2 face="sans-serif">Changed OTAR procedure (all related
occurrences in the document): Remove CRC as agreed in the last meeting.
Uplink is now pairs of (Key ID, Key)</font>
<li><font size=2 face="sans-serif">Changed Key Verification procedure (all
related occurrences in the document): This procedure is now back to the
Challenge Response of the previous versions of the Blue Book</font>
<li><font size=2 face="sans-serif">Master Keys:</font>
<ul>
<li><font size=2 face="sans-serif">It was agreed that master keys should
only be explicitly required in the OTAR. In the previous version, also
the Key Verification procedure was referring to the use of a master key.
This has been changed and the procedure now just talks about a "key
protection key" that can be either a master or a session key</font>
<li><font size=2 face="sans-serif">Removed 4.3.1.3: "Two Security
Associations shall be reserved for use with the SDLS Extended Procedures
and shall be active upon start of a mission phase. "</font></ul>
<li><font size=2 face="sans-serif">ARC: Added ARC to the Rekey SA procedure
as a mandatory, managed field. In the baseline mode, as agreed, its 64
bit. Please note that the data structure pictures in Sections 5.5.1.3 (Rekey
SA) and 7.1.1.3 (Rekey SA Baseline Mode) still require update since the
document contains only image files for them an not the Visio sources (<b>@Craig</b>,
could you please provide them to me?).</font>
<li><font size=2 face="sans-serif">Unique Identification of Sender and
Receiver VCs: This is addressed now by new clauses 5.3.2.2.2.3.3 and 5.3.2.2.2.3.4,
</font>
<li><font size=2 face="sans-serif">Moved and Renamed Read Sequence Number
from M&C to Read ARC in SA management</font>
<li><font size=2 face="sans-serif">Added Annex E for Acronyms...there are
probably still some missing.</font>
<ul>
<li></ul></ul><font size=2 face="sans-serif">Cheers and see you all in Den
Haag,</font>
<br><font size=2 face="sans-serif">Daniel</font>
<br>
<br>
<br>
<br>
<br><font size=1 color=#00a1e0 face="Verdana"><b>Dr. Daniel Fischer</b></font><font size=1 color=#808080 face="Verdana"><br>
Head of the Engineering Support Section, OPS-GES<br>
Ground Systems Engineering Department</font>
<br><font size=1 color=#808080 face="Verdana">Directorate of Operations</font>
<p><font size=1 color=#808080 face="Verdana"><b>ESA - ESOC</b><br>
Robert-Bosch-Str. 5, D-64392 Darmstadt, Germany</font>
<p><font size=1 color=#808080 face="Verdana">Tel. +49 6151 90 2718 |  E-mail:
Daniel.Fischer@esa.int<br>
</font>
<br>
<br><font size=1 color=#808080 face="Arial"><b><i>Disclaimer</i></b></font>
<br><font size=1 color=#808080 face="Arial"><i>This message and any attachments
are intended for the use of the addressee or addressees only. The unauthorized
disclosure, use, dissemination or copying (either in whole or in part)
of its content is not permitted. If you received this message in error,
please notify the sender and delete it from your system. Emails can be
altered and their integrity cannot be guaranteed by the sender. Please
consider the environment before printing this email.</i></font>