<br><font size=2 face="sans-serif">More info, Enrico</font>
<br><font size=1 color=#800080 face="sans-serif">----- Forwarded by Enrico
Vassallo/esoc/ESA on 29/01/2007 10:37 -----</font>
<br>
<table width=100%>
<tr valign=top>
<td width=40%><font size=1 face="sans-serif"><b>Jean-Luc Gerner/estec/ESA</b>
</font>
<p><font size=1 face="sans-serif">25/01/2007 01:06</font>
<td width=59%>
<table width=100%>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">To</font></div>
<td><font size=1 face="sans-serif">Enrico Vassallo/esoc/ESA@ESA, Gian Paolo
Calzolari/esoc/ESA, greg.kazz@jpl.nasa.gov @ ESA, pen-shu.yeh@gsfc.nasa.gov
@ ESA</font>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">cc</font></div>
<td><font size=1 face="sans-serif">Gilles.Moury@cnes.fr @ ESA</font>
<tr valign=top>
<td>
<div align=right><font size=1 face="sans-serif">Subject</font></div>
<td><font size=1 face="sans-serif">CCSDS SLS Presentation to CMC</font></table>
<br>
<table>
<tr valign=top>
<td>
<td></table>
<br></table>
<br>
<br>
<br><font size=2 face="sans-serif">Dear all,</font>
<br><font size=2 face="sans-serif">Thanks again for your contribution.
The presentation went well and resolutions were accepted.</font>
<br>
<br><font size=2 face="sans-serif">The only point to be noted is related
with putting WGs in limbo for further reactivation:</font>
<br><font size=2 face="sans-serif">- For TCC, the CMC decided that it should
be closed and a new WG created once the HRU needs are identified (which
may take some time!).</font>
<br><font size=2 face="sans-serif">- For SLP, CMC did not react to the
proposal to set it idle until clear requirements are available from Mars
BOF, Wireless BOF, Cislunar WG, ... However, My feeling and that of Gilles
is that we better close it because one does not know when it could be reactivated,
given that no clear need is expected to be available at the moment. Greg,
what do you think?</font>
<br>
<br><font size=2 face="sans-serif">Cross-area issues:</font>
<br><font size=2 face="sans-serif"><b>Lunar/Mars missions. New needs may
not be covered by Prox-1. New needs are to be identified. Upgrade of Prox-1
(?), development of Prox-2 (?). Inter-areas coordination to be put in place
with SIS (Cislunar WG, Mars BOF) and SOIS (Wireless BOF). </b></font>
<br><font size=2 face="sans-serif">On this one, the CMC agreed that inter-agency
coordination is needed. Decision to put in place a mailing list for easy
info exchange between parties.</font>
<br>
<br><font size=2 face="sans-serif">Cheers</font>
<br><font size=2 face="sans-serif">Jean-Luc Gerner<br>
TEC-ETN<br>
Tel: +31 71 565 4473</font>