<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
</head>
<body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; font-size: 14px; font-family: Calibri, sans-serif; ">
<div style="color: rgb(0, 0, 0); ">Dear SEA Exec,</div>
<div style="color: rgb(0, 0, 0); "><br>
</div>
<div style="color: rgb(0, 0, 0); ">We are being asked by the CMC to do three things:</div>
<ol>
<li>Update the area goals (<font class="Apple-style-span" color="#ff0000">I'll do that</font>)</li><li><span class="Apple-style-span" style="color: rgb(0, 0, 0); ">Update the current projects and schedules (</span><font class="Apple-style-span" color="#ff0000">each WG chair must do that</font>)</li><li><span class="Apple-style-span" style="color: rgb(0, 0, 0); ">Add new future projects (</span><font class="Apple-style-span" color="#ff0000">you must do this as well</font>)</li></ol>
<div>The following message shows what Nestor's assessment is of the specific issues. <b><font class="Apple-style-span" color="#ff0000">Please deal with them this week.</font></b></div>
<div style="color: rgb(0, 0, 0); "><br>
</div>
<div style="color: rgb(0, 0, 0); ">For the future projects my request is that you insert into the Project set any of the projects that you have been discussing in the WG, even if they are still in a very loose, formative, stage. I know that it is often hard,
when you are doing all you can now to get current projects done, to think about future work. But be aware that the CMC has been asking what this future work looks like. And they are asking if, when the current projects are done, that the WG will close. It
is certainly possible that that may happen, especially if the work you forecasted is complete. </div>
<div style="color: rgb(0, 0, 0); "><br>
</div>
<div style="color: rgb(0, 0, 0); ">There is no need to keep a WG going if it has done what it set out to do. Note that we closed the SEA System Architecture WG (SAWG) when its work on RASDS was completed. Also note that the CCSDS requirement that standards
be reviewed and "refreshed" every five years might mean that WG gets restarted. We are about to do that with the SAWG to refresh RASDS.</div>
<div style="color: rgb(0, 0, 0); "><br>
</div>
<div style="color: rgb(0, 0, 0); ">I know that this is added work, but please take an hour of your WG scheduled sessions to brainstorm and describe those future projects that make sense. Then put them into the framework.</div>
<div style="color: rgb(0, 0, 0); "><br>
</div>
<div style="color: rgb(0, 0, 0); ">Thanks, Peter</div>
<div style="color: rgb(0, 0, 0); "><br>
</div>
<div style="color: rgb(0, 0, 0); "><br>
</div>
<span id="OLK_SRC_BODY_SECTION" style="color: rgb(0, 0, 0); ">
<div style="font-family:Calibri; font-size:11pt; text-align:left; color:black; BORDER-BOTTOM: medium none; BORDER-LEFT: medium none; PADDING-BOTTOM: 0in; PADDING-LEFT: 0in; PADDING-RIGHT: 0in; BORDER-TOP: #b5c4df 1pt solid; BORDER-RIGHT: medium none; PADDING-TOP: 3pt">
<span style="font-weight:bold">From: </span>Nestor Peccia <<a href="mailto:Nestor.Peccia@esa.int">Nestor.Peccia@esa.int</a>><br>
<span style="font-weight:bold">Date: </span>Sunday, November 2, 2014 11:42 AM<br>
<span style="font-weight:bold">To: </span>Peter Shames <<a href="mailto:peter.m.shames@jpl.nasa.gov">peter.m.shames@jpl.nasa.gov</a>>, "Weiss, Howard" <<a href="mailto:Howard.Weiss@parsons.com">Howard.Weiss@parsons.com</a>>, Mattia Mercolino <<a href="mailto:Mattia.Mercolino@esa.int">Mattia.Mercolino@esa.int</a>><br>
<span style="font-weight:bold">Cc: </span>CCSDS Engineering Steering Group - CESG Exec <<a href="mailto:cesg@mailman.ccsds.org">cesg@mailman.ccsds.org</a>>, CMC <<a href="mailto:cmc@mailman.ccsds.org">cmc@mailman.ccsds.org</a>><br>
<span style="font-weight:bold">Subject: </span>SEA Area: Goals / Project Checks needed in the WGs<br>
</div>
<div><br>
</div>
<blockquote id="MAC_OUTLOOK_ATTRIBUTION_BLOCKQUOTE" style="BORDER-LEFT: #b5c4df 5 solid; PADDING:0 0 0 5; MARGIN:0 0 0 5;">
<div>
<div><font size="2" face="sans-serif">Dear all,</font> <br>
<br>
<font size="2" face="sans-serif">As the CESG and CMC will review the current Strategic Plan during our planned joint meeting at London, it is recommended to</font>
<ul>
<li><font size="2" face="sans-serif">check the Area goals and update if needed</font></li><li><font size="2" face="sans-serif">check the links wrt published books and update if needed</font></li><li><font size="2" face="sans-serif">cross check the schedule of our current books under production and update if needed</font></li><li><font size="2" face="sans-serif">include the future work as CWE Projects with a start date (realistic please) in the future
</font></li></ul>
<br>
<font size="2" face="sans-serif">in particular</font> <br>
<br>
<font size="2" face="sans-serif"><b><u>Security WG</u></b></font>
<ol>
<li value="1"><font size="2" face="sans-serif">Network Layer Security Adaptation Profile BB Completion Date: 18.02.2015 </font><font size="2" color="red" face="sans-serif">Is Schedule realistic ? If not, include new estimated completion
date ?</font> </li><li value="2"><font size="2" face="sans-serif">Security Threats against Space Mission Revision GB Completion Date: 01.06.2015 </font><font size="2" color="red" face="sans-serif">Is Schedule realistic ? If not, include new estimated completion
date ?</font></li></ol>
<font size="2" face="sans-serif">No more standards foreseen after 2016 / Q1 2017 </font><font size="2" color="red" face="sans-serif">Goals achieved ? WG to be disbanded ? or Schedule to be adapted
?</font> <br>
<br>
<font size="2" face="sans-serif"><b><u>D-DOR WG</u></b></font> <br>
<font size="2" face="sans-serif">No more standards foreseen after 2016 / 2017 </font><font size="2" color="red" face="sans-serif">Goals achieved ? WG to be disbanded ?</font><br>
<br>
<font size="2" face="sans-serif"><b><u>Future Work</u></b></font>
<ol>
<li value="1"><font size="2" face="sans-serif">Reference Information Architecture, Infrastructure Services and Interfaces MB </font><font size="2" color="red" face="sans-serif">Insert Project. Start Date in future. Realistic schedule
(resources?) to be considered </font> </li><li value="2"><font size="2" face="sans-serif">XML Standards and Guidelines MB </font><font size="2" color="red" face="sans-serif">Insert Project. Start Date in future. Realistic schedule
(resources?) to be considered.</font> </li><li value="3"><font size="2" face="sans-serif">Timeline Data Standard BB </font><font size="2" color="red" face="sans-serif">Insert Project. Start Date in future. Realistic schedule
(resources?) to be considered.</font> </li><li value="4"><font size="2" face="sans-serif">Time Service Architecture MB </font><font size="2" color="red" face="sans-serif">Insert Project. Start Date in future. Realistic schedule
(resources?) to be considered.</font> </li><li value="5"><font size="2" face="sans-serif">CCSDS Standards Reference Architecture MB </font><font size="2" color="red" face="sans-serif">Is this a duplication of next book ?</font></li><li value="6"><font size="2" face="sans-serif">Reference Architecture for Space Data Systems (Issue 2 after 5 year Review) MB </font><font size="2" color="red" face="sans-serif">Insert Project. Start Date in future. Realistic schedule
(resources?) to be considered.</font></li></ol>
<br>
<font size="2" face="sans-serif">ciao</font> <br>
<font size="2" face="sans-serif">nestor</font>
<pre>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.
Please consider the environment before printing this email.
</pre>
</div>
</div>
</blockquote>
</span>
</body>
</html>