<font size=2 face="Arial">Please have a look at the preliminary information
from the CMC meeting. Below I have grouped my comments/questions by WG.
Please also have a look at my proposed comments to CESG.</font>
<br>
<br><font size=2 face="Arial">@NAV:</font>
<ul>
<li><font size=2 face="Arial">Please note request to update CWE.</font>
<li><font size=2 face="Arial">Respond (hopefully negatively and in coordination
with Brigitte and me) to CMC request to cancel the projects: PRM, NHW,
SSM</font>
<li><font size=2 face="Arial">New projects: please confirm that we have
the 2nd prototype for Navigation Data Message / XML Specification. As said
already, since in my understanding this 5-year revision consists of removing
material from the published book, I recommend to look if the no-prototype
option could be justified in this case.</font>
<li><font size=2 face="Arial">Please take note of the last 3 bullets.</font></ul>
<br><font size=2 face="Arial">@SM&C:</font>
<ul>
<li><font size=2 face="Arial">Respond (hopefully negatively and in coordination
with Brigitte and me) to CMC request to cancel the projects: HTTP Transport
Binding and XML Encoding and </font><font size=2 face="sans-serif">Data
Product Distribution Services</font>
<li><font size=2 face="Arial">Please take note of the last 3 bullets.</font></ul>
<br><font size=2 face="Arial">@DAI and MP&S:</font>
<ul>
<li><font size=2 face="Arial">No specific issue</font>
<li><font size=2 face="Arial">Please take note of the last 3 bullets.</font></ul>
<br><font size=2 face="Arial">@CESG</font>
<ul>
<li><font size=2 face="Arial">There might be a solution for the TEL chair:
stay on the line ...</font>
<li><font size=2 face="Arial">"</font><font size=2 face="sans-serif">MAL
XML encoding</font><font size=2 face="Arial">" should read "HTTP
Transport Binding and XML Encoding". In addition, I think it would
be a mistake to cancel this project as the book and 1 prototype is available
Indeed JPL is looking into supporting the 2nd prototype. In any case, I
am sure we will find a solution.</font>
<li><font size=2 face="Arial">The following NAV document has been forgotten:
Navigation Data Message / XML Specification. Since this 5-year revision
consists of removing material from the published book, the no-prototype
option can be justified and is being considered by the NAV WG.</font></ul>
<br><font size=2 face="Arial">Regards,</font>
<br>
<br><font size=2 face="Arial">__Mario</font>
<br><font size=1 color=#800080 face="sans-serif">----- Forwarded by Mario
Merri/esoc/ESA on 28/04/2016 17:38 -----</font>
<br>
<br><font size=1 color=#5f5f5f face="sans-serif">From:      
 </font><font size=1 face="sans-serif">Nestor.Peccia@esa.int</font>
<br><font size=1 color=#5f5f5f face="sans-serif">To:      
 </font><font size=1 face="sans-serif">"CCSDS Engineering
Steering Group - CESG Exec(cesg@mailman.ccsds.org)" <cesg@mailman.ccsds.org></font>
<br><font size=1 color=#5f5f5f face="sans-serif">Date:      
 </font><font size=1 face="sans-serif">27/04/2016 17:47</font>
<br><font size=1 color=#5f5f5f face="sans-serif">Subject:    
   </font><font size=1 face="sans-serif">[CESG] News
from CMC" Part 1</font>
<br><font size=1 color=#5f5f5f face="sans-serif">Sent by:    
   </font><font size=1 face="sans-serif">cesg-bounces@mailman.ccsds.org</font>
<br>
<hr noshade>
<br>
<br>
<br><font size=2 face="sans-serif">Dear all</font><font size=3> <br>
</font><font size=2 face="sans-serif"><br>
Some news from the CMC meeting:</font><font size=3> </font>
<ul>
<li><font size=2 face="sans-serif"><b><u>Prototype 2 missing resources</u></b></font><font size=3>
</font><font size=2 face="sans-serif"><br>
CMC has completed his action on missing resources, Conclusion is as follows:</font><font size=3>
</font>
<ul>
<li><font size=2 face="sans-serif">CMC polls are on-going to grant resources
for SM&C Projects (MAL Binding to TCP/IP, CNES = 1 mm and MAL Binding
to ZeroMQ, ESA = 1 mm)</font><font size=3> </font>
<li><font size=2 face="sans-serif">Two additional resources have been found
for NAV ADM 5 year review (ESA proto 2 resources granted) and DTN BSP (DLR
proto 2 resources granted). CMC approved unanimously both Projects. WG
Chairs (i.e. <b>Keith for DTN </b>and David for NAV) to include the related
resources in the CWE Project. <b>@ Mario / Brigitte: </b>Please contact
David Berry</font><font size=3> </font>
<li><font size=2 face="sans-serif">We are still missing 5 proto 2 resources
excluding TEL BB, for which the CMC assumes that the WG will be disbanded
soon.</font><font size=3> </font>
<br><font size=2 face="sans-serif">1.        NAV
PRM</font><font size=3> </font>
<br><font size=2 face="sans-serif">2.        NAV
NHW</font><font size=3> </font>
<br><font size=2 face="sans-serif">3.        NAV
SSM</font><font size=3> </font>
<br><font size=2 face="sans-serif">4.        SM&C
MAL XML encoding</font><font size=3> </font>
<br><font size=2 face="sans-serif">5.        SM&C
Data Product Distribution Services</font>
<br><font size=2 face="sans-serif">As the CMC does not intend to deploy
resources for these Projects in the near future, WGs are asked to review
their work plan and assess if it makes sense to cancel the Project. I have
mentioned that for the XML encoding we are awaiting the closure of an action
placed upon JPL on the bilateral shadow projects.</font><font size=3> </font><font size=2 face="sans-serif"><b><br>
@ Mario / Brigitte</b>: Please contact David Berry / Franck Dreger and
Dan Smith / Sam Cooper</font></ul>
<li><font size=2 face="sans-serif"><b><u>New Projects to be submitted for
approval before mid October 2016</u></b></font><font size=3> </font><font size=2 face="sans-serif"><br>
I was asked yesterday by the CMC to produce a list of the Draft Projects
that will be submitted for approval (and granting of resources in the period
2016/2017/2018) in the next 6 months. I have produced a draft list (and
sorry if I have made some mistakes but there was no time for requesting
your feedback)</font></ul><img src=cid:_1_0E11E4700E11E2040058D202C1257FA3 width=723 height=436 style="border:0px solid;"><font size=2 face="sans-serif"><br>
The CMC compared this list with its priorities and gave in real time its
agreement (or its lack of) to deploy resources when the related polls are
issued. ESA was not in a position to grant resources for the years 2017/2018</font><font size=3>
</font><font size=2 face="sans-serif"><b><br>
@ all ADs/DADs</b>: Please let me know if I have omitted any Project to
be submitted for CMC approval before mid October 2016</font><font size=3>
</font><font size=2 face="sans-serif"><br>
The chart has been added to the presentation " ...extra agenda items..."
and is uploaded in the CWE</font><font size=3> </font>
<ul>
<li><font size=2 face="sans-serif"><b><u>New action placed upon the CESG
(ADs/DADs)</u></b></font><font size=3> </font><font size=2 face="sans-serif"><br>
CMC requests that the following is included in every Area future presentation
to the CMC</font><font size=3> </font>
<br><font size=2 face="sans-serif">1.        Area
Document Summary (as SIS did in its last presentation)</font><font size=3>
</font>
<br><font size=2 face="sans-serif">2.        List
of Projects to be submitted for approval (and granting of resources) in
the next 6 months</font>
<br><font size=2 face="sans-serif">I will include both items when proposing
a new template for the CESG Presentation to the CMC</font><font size=3>
</font>
<li><font size=2 face="sans-serif"><b><u>Technical Meeting Duration</u></b></font><font size=3>
</font><font size=2 face="sans-serif"><br>
There was a length discussion about technical meeting duration wiyhout
any conclusion. I, as CESG Chair, have proposed to take the ASI meeting
as pilot to have a maximum of 12 meeting rooms per day in order to optimise
the room utilisation on Monday and Friday. CESG Chair (together with the
Secretariat) will help in solving the coflicts and overlaps.</font><font size=3>
</font>
<li><font size=2 face="sans-serif"><b><u>Lunar / Mars Exploration standards</u></b></font><font size=3>
</font><font size=2 face="sans-serif"><br>
Although IOAG has agreed (after a CCSDS request) to look at the future
Lunar / Mars Missions to discover potential gaps or missing standards,
every AD/DAD/WG Chairs are invited to discuss the issue during next webex
or technical meetings, @ ADs/DADs : Please pass the message to your WG
Chairs</font></ul><font size=2 face="sans-serif"><br>
Part 2 will be sent tomorrow</font><font size=3> <br>
</font><font size=2 face="sans-serif"><br>
ciao</font><font size=3> </font><font size=2 face="sans-serif"><br>
nestor</font>
<br><tt><font size=3>This message and any attachments are intended for
the use of the addressee or addressees only.<br>
The unauthorised disclosure, use, dissemination or copying (either in whole
or in part) of its<br>
content is not permitted.<br>
If you received this message in error, please notify the sender and delete
it from your system.<br>
Emails can be altered and their integrity cannot be guaranteed by the sender.<br>
<br>
Please consider the environment before printing this email.<br>
</font></tt><tt><font size=2>_______________________________________________<br>
CESG mailing list<br>
CESG@mailman.ccsds.org<br>
</font></tt><a href=http://mailman.ccsds.org/mailman/listinfo/cesg><tt><font size=2>http://mailman.ccsds.org/mailman/listinfo/cesg</font></tt></a><tt><font size=2><br>
</font></tt>
<br><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>