<br><font size=2 face="Arial">Below a summary of the relevant points from
the CESG/CMC meetings in Darmstadt. The main focus was to identify and
possibly resolve issues for projects with missing resources (e.g. unassigned
2nd prototype) in 2016. The dates for book and prototypes availability
were taken from the CWE => <b>it is important that you keep the dates
and resources of your projects updated</b>.</font>
<br>
<br><font size=2 face="Arial"><b>Approved projects</b></font>
<ul>
<li><font size=2 face="Arial">NAV ADM: CNES committed to 1st prototype;
no resource needed for 2nd prototype in 2016 (it is in 2017 in CWE). CMC
has an action to look for resources for 2017</font>
<li><font size=2 face="Arial">NAV NHM: NASA committed to 1st prototype;
no resource needed for 2nd prototype in 2016 (it is in 2017 in CWE). CMC
has an action to look for resources for 2017</font>
<li><font size=2 face="Arial">NAV PRM: ESA committed to 1st prototype;
no resource needed for 2nd prototype in 2016 (it is in 2017 in CWE). CMC
has an action to look for resources for 2017</font>
<li><font size=2 face="Arial">NAV SMM: NASA committed to 1st prototype;
CMC has an action to identify resources (3mm) for 2nd prototype in 2016</font></ul>
<ul>
<li><font size=2 face="Arial">SM&C HTTP and XML: ESA committed to 1st
prototype; NASA to confirm for 2nd prototype possibly based on ESOC-JPL
MEX shadow project (send info to PS and EB)</font>
<li><font size=2 face="Arial">SM&C TCP/IP and Binary: ESA committed
to 1st prototype; CNES to confirm for 2nd prototype</font>
<li><font size=2 face="Arial">SM&C ZeroMQ and Binary: CNES committed
to 1st prototype; ESA committed to 2nd prototype (update CWE) </font>
<li><font size=2 face="Arial">SM&C Data Product Distribution Service:
no resource needed for 2nd prototype in 2016</font></ul>
<ul>
<li><font size=2 face="Arial">TEL BB: No prototype needed in 2016.</font></ul>
<br><font size=2 face="Arial"><b>Draft Projects</b></font>
<ul>
<li><font size=2 face="Arial">NAV Event Messages: only limited need of
resources in 2016 (i.e. normal work) as only monitoring the work of CSS/SM
Event messages.</font>
<li>
<li><font size=2 face="Arial">SM&C C++: NASA has agreed to commit 1mm
in 2016. No prototype needed (MB). Initiate the project to move from draft
to approved.</font></ul>
<li>
<br><font size=2 face="Arial">I would also suggest that you are not just
content of reading above  "CMC has an action to look for resources
..." and I would not recommend that you just sit and wait for these
resources. I invite you to be proactive in your WG and try to involve other
agencies in the work. Also, if possible, try to be creative to identify
additional resources (e.g. studies, trainees, students, ...).</font>
<br>
<br><font size=2 face="Arial">In terms of main decision, I would like to
bring to your attention the following:</font>
<ol>
<li value=1><font size=2 face="Arial">The CMC has agreed that priority
shall be given to approved projects over draft projects</font>
<li value=2><font size=2 face="Arial">The CMC has agreed that future BB
draft projects shall be approved by CMC ONLY if both prototypes have sponsoring
agencies.</font></ol>
<br><font size=2 face="Arial">Regards,</font>
<br>
<br><font size=2 face="Arial">__Mario</font><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>