<font size=2 face="sans-serif">Dear all,</font>
<br>
<br><font size=2 face="sans-serif">I attach below the CMC comments on our
MOIMS Area (considering Strategic Plan and CWE Projects).</font>
<br>
<br><font size=2 face="sans-serif">Please discuss them during this week
and include the responses in your report to the MOIMS AD at Friday's MOIMS
Plenary</font>
<br>
<br><font size=2 face="sans-serif">ciao</font>
<br><font size=2 face="sans-serif">nestor</font>
<br><font size=2 face="sans-serif">=======================================</font>
<br>
<br><font size=2 face="sans-serif">MOIMS  </font>
<ol>
<li value=1><font size=2 face="sans-serif">Goal 5 “Digital Repository
Criteria” completed (no current/future work)        
               
               
               
       </font><font size=2 color=red face="sans-serif"><b>RAC
WG response required</b></font>
<li value=2><font size=2 face="sans-serif">Data and Metadata External Framework
standards and Data Archival and Retrieval work is ending in 2016. Goals
achieved?        </font><font size=2 color=red face="sans-serif"><b>DAI
/ WG response required</b></font>
<li value=3><font size=2 face="sans-serif">Mid-term objectives (2017-2018)
only for MO services; they are linked to the standards on technology mapping
and binding. The resources needed for this work should be assessed. </font><font size=2 color=red face="sans-serif"><b>SM&C
WG response required</b></font>
<li value=4><font size=2 face="sans-serif">No long terms objectives (2019-2020)
defined, although MO services are likely to take longer      
   </font><font size=2 color=red face="sans-serif"><b>NAV/DAI/RAC/TEL/SMC
response required</b></font>
<li value=5><font size=2 face="sans-serif">Most of the MO services BB’s
in the CWE are not started and/or are behind schedule. What is the strategy
proposed to progress these projects? Will the IOAG / MOSSG inputs on service
priorities be considered to reschedule the parallel tasks?    
  </font><font size=2 color=red face="sans-serif"><b>SMC WG response
required</b></font>
<li value=6><font size=2 face="sans-serif">Workplan for Tele-robotics defined?
   </font><font size=2 color=red face="sans-serif"><b>TEL WG
response required</b></font>
<li value=7><font size=2 face="sans-serif">NAV and DAI WGs have no activities
identified as part of FP beyond 2016.  Is it anticipated that all
goals will then be achieved and the group has no further activity ? </font><font size=2 color=red face="sans-serif"><b>NAV
and DAI WG response required</b></font></ol>
<br><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>