[Moims-rac] Restructuring B1 of the working document
Lambert, SC (Simon)
S.C.Lambert at rl.ac.uk
Thu Aug 7 05:37:36 EDT 2008
Dear All,
I've been catching up on the notes of the weekly MegaMeetings and I saw
there was an action on me to restructure section B1 in a similar way to
what Mark Conrad has proposed for B2. This would mean making the
requirements more hierarchical or combining them so that the structure
and logic is clearer. As a preliminary step towards this, I've reviewed
B1 as it stands and suggest the following logical flow for the
requirements:
The repository:
- Is clear about what it undertakes to preserve
- Specifies what it needs from the content provider to enable that
preservation (this probably includes the "physical control" issue)
- Checks that it receives what it needs
- Checks that what it receives is from the expected source
- Informs the content provider that it has received the SIP and taken
responsibility for it (with the caveat that there might not be a
provider in the case of harvesting etc.)
- Keeps records of relevant actions that it takes concerning the
ingest process
Does that look like a reasonable basis for restructuring the
requirements? If so I will go ahead work on it in more detail, but I
just wanted to check that this is a good starting point.
By the way, I noticed that on the wiki page for section B of the
requirements at
http://wiki.digitalrepositoryauditandcertification.org/bin/view/Main/Req
tsWithTemplateB, all the text on the page from B2.2 onwards is marked as
deleted (at least when viewing with Internet Explorer). This is
probbaly because a closing markup </del> has been omitted somewhere.
I'm guessing that the </del> should probably be after John Garrett's
comment to B2.1 but maybe someone who has worked on the page more
recently than I have could confirm that.
Thanks,
Simon
More information about the Moims-rac
mailing list