<span style=" font-size:10pt;font-family:sans-serif">Dear all,</span><span style=" font-size:12pt">
</span><span style=" font-size:10pt;font-family:sans-serif"><br>
<br>
Please find below the minutes of the MP&S WG meeting from this afternoon.
Let me know if I missed something.</span><span style=" font-size:12pt">
</span><span style=" font-size:10pt;font-family:sans-serif"><br>
<br>
Best regards,</span><span style=" font-size:12pt"> </span><span style=" font-size:10pt;font-family:sans-serif"><br>
<br>
Peter</span><span style=" font-size:12pt"> </span><span style=" font-size:10pt;font-family:sans-serif"><br>
<br>
--</span><span style=" font-size:12pt"> </span><span style=" font-size:10pt;font-family:sans-serif"><br>
<br>
Subject: Mission Planning & Scheduling WG meeting<br>
Date and time: 1 December 2021, 16:00 - 18:00 CET<br>
Location: WebEx</span><span style=" font-size:12pt"> </span><span style=" font-size:10pt;font-family:sans-serif"><u><br>
<br>
Attendance list</u><br>
<br>
- Peter van der Plas (ESA, chair)</span>
<br><span style=" font-size:10pt;font-family:sans-serif">- Marc Duhaze
(CNES, deputy chair)<br>
- Christoph Lenzen (DLR)<br>
- Geoffrey Lochmaier (NASA)</span>
<br><span style=" font-size:10pt;font-family:sans-serif">- Guillermo Buenadicha
(ESA)<br>
- Ioannis Angelis (ESA)</span>
<br><span style=" font-size:10pt;font-family:sans-serif">- Maria Woerle
(DLR)<br>
- Olly Page (UKSA)<br>
- Rachel Jenkins (ESA)<br>
- Roger Thompson (ESA)</span>
<br><span style=" font-size:10pt;font-family:sans-serif">- Tony Barrett
(NASA)<br>
- Veniamin Zlobin (ESA)</span><span style=" font-size:12pt"> </span><span style=" font-size:10pt;font-family:sans-serif"><u><br>
<br>
Agenda</u></span><span style=" font-size:12pt"> </span><span style=" font-size:10pt;font-family:sans-serif"><br>
<br>
1. Blue Book status and way forward<br>
2. Prototyping status and way forward<br>
3. AOB</span><span style=" font-size:12pt"> </span><span style=" font-size:10pt;font-family:sans-serif"><u><br>
<br>
Minutes</u> <br>
<br>
1. Blue Book status and way forward<br>
</span>
<br><span style=" font-size:10pt;font-family:sans-serif">Roger has made
available on the Gdrive an updated Blue Book (draft F) and an updated Information
Model (EA model draft S). For a detailed description of the changes, refer
to the email from Roger dated 29/11/2021.</span>
<br>
<br><span style=" font-size:10pt;font-family:sans-serif">The changes to
the BB and EA model were presented by Roger. Tony asked if the latest XML
Schemas are available. Roger will provide these on the Gdrive.</span>
<br>
<br><span style=" font-size:10pt;font-family:sans-serif">Some work is remaining
on the EA model and the automated XML Schema generation, in particular
with the work-around to preserve the attribute order in the generated schemas.
Roger showed some additional capabilities of schema validation, e.g. with
restrictions and choices. The WG confirmed that having more advanced XML
Schema validation is considered beneficial. Note that this goes beyond
the definitions in the Information Model. Peter still has some open actions
regarding the XML Schemas, e.g. on the use of namespaces and the mapping
of the MAL::List type.<br>
</span>
<br><span style=" font-size:10pt;font-family:sans-serif">It is currently
planned that the MP&S Blue Book will be submitted for Agencies Review
in Q1 2022. For this, the referenced SANA artefacts (MP&S namespace(s),
XML Schemas and XML Service Specifications) shall be available in the SANA
Beta Registry. The BB review will be done with assumptions on the (agreed)
MAL evolution. These assumptions shall be listed in the Red Book. In case
the final MAL changes are not in line with the assumptions made, then a
second Agencies Review could be necessary. However, with the currently
planned public review, the majority of the MP&S standard is stable
and can be reviewed.</span>
<br>
<br><span style=" font-size:10pt;font-family:sans-serif">Publication of
the MP&S Blue Book can not take place before the publication of the
updated MAL BB, planned for end 2022. As such, the currently planned publication
date for the MP&S Blue Book is also the end of 2022.<br>
<br>
2. Prototyping status and way forward <br>
<br>
ESOC will resume the work on the prototyping next week. DLR have implemented
the report generation, for ESOC to review. For the Yellow Book, Guillermo
will provide the XML tables in the issue 2.1 of the Yellow Book, available
on the Gdrive. Next regular prototyping meeting will be 16 December 2021.<br>
<br>
3. AOB <br>
<br>
Next MP&S WG meeting planned for <b>Tuesday</b> 18 January 2022, 16:00
- 18:00 CET. Peter to send the WebEx invitation.</span><span style=" font-size:12pt"><br>
</span>
<br><span style=" font-size:10pt;font-family:sans-serif">--</span>
<br>
<br><span style=" font-size:8pt;color:#808080;font-family:Verdana"><b>ESA
- European Space Agency</b><br>
</span><span style=" font-size:8pt;color:#00a1e0;font-family:Verdana"><br>
<b>Peter van der Plas</b></span><span style=" font-size:8pt;color:#808080;font-family:Verdana"><br>
EGSE and Ground Systems section (TEC-SWG)<br>
Directorate of Technology, Engineering and Quality<br>
<b><br>
ESTEC</b><br>
Keplerlaan 1, PO Box 299, NL-2200 AG Noordwijk, The Netherlands</span><span style=" font-size:8pt;color:#8f8f8f;font-family:Verdana"><u><br>
</u></span><a href=mailto:Peter.van.der.Plas@esa.int><span style=" font-size:8pt;color:#8f8f8f;font-family:Verdana"><u>Peter.van.der.Plas@esa.int</u></span></a><span style=" font-size:8pt;color:#808080;font-family:Verdana">
| </span><a href=http://www.esa.int/><span style=" font-size:8pt;color:#8f8f8f;font-family:Verdana"><u>www.esa.int</u></span></a><span style=" font-size:8pt;color:#808080;font-family:Verdana"><br>
Phone +31 71 565 5848 | Fax +31 71 565 5420 | Mobile +31 6 51 93 44 30</span>
<br><PRE>This message is intended only for the recipient(s) named above. It may contain proprietary information and/or
protected content. Any unauthorised disclosure, use, retention or dissemination is prohibited. If you have received
this e-mail in error, please notify the sender immediately. ESA applies appropriate organisational measures to protect
personal data, in case of data privacy queries, please contact the ESA Data Protection Officer (dpo@esa.int).
</PRE>