<font size=2 face="sans-serif">FYI</font>
<br>
<br><font size=1 color=#800080 face="sans-serif">----- Forwarded by Nestor
Peccia/esoc/ESA on 02/10/2016 18:00 -----</font>
<br>
<br><font size=1 color=#5f5f5f face="sans-serif">From:      
 </font><font size=1 face="sans-serif">Nestor Peccia/esoc/ESA</font>
<br><font size=1 color=#5f5f5f face="sans-serif">To:      
 </font><font size=1 face="sans-serif">"CCSDS Engineering
Steering Group - CESG All" <cesg-all@mailman.ccsds.org></font>
<br><font size=1 color=#5f5f5f face="sans-serif">Date:      
 </font><font size=1 face="sans-serif">02/10/2016 17:59</font>
<br><font size=1 color=#5f5f5f face="sans-serif">Subject:    
   </font><font size=1 face="sans-serif">New templates
to be used by WG Chairs and ADs/DADs for their reports during the CCSDS
Fall 2016 meeting</font>
<br>
<hr noshade>
<br>
<br><font size=2 face="sans-serif">Dear WG Chairs / ADs / DADs </font>
<br>
<br><font size=2 color=blue face="sans-serif"><b>I can imagine that the
following request will raise some comments/issues/etc., but I am asking
for your comprehension and help.</b></font>
<br>
<br><font size=2 face="sans-serif">CESG has agreed to introduce new templates
for </font>
<ul>
<li><font size=2 face="sans-serif">WG Report to the Area</font>
<li><font size=2 face="sans-serif">Area Report to CESG</font></ul><font size=2 color=red face="sans-serif"><b>Some
of the charts included in the new templates have been requested by the
CMC, (</b>i.e. Approved Project Status, Resource issues for approved Projects,
Upcoming New Work Items)</font>
<br>
<br><font size=2 face="sans-serif">As its agreement at CESG level  has
taken some time, we are asking everybody to use the template and give <u>only</u>
feedback to your AD/DAD during the Area Plenary to be held on 21st October
2016.</font>
<br>
<br><font size=2 face="sans-serif">CESG will discuss all comments during
its meeting on 24th October 2016, and update the template for the next
meeting in San Antonio.</font>
<br>
<br><font size=2 face="sans-serif">You will find below some indications</font>
<br><font size=2 face="sans-serif">ciao</font>
<br><font size=2 face="sans-serif">nestor</font>
<br>
<br><font size=2 face="sans-serif">============</font>
<br><font size=2 face="sans-serif"><b>WG Chairs</b></font>
<br><font size=2 face="sans-serif">Please use the following template for
your next report</font>
<br>
<br><font size=2 face="sans-serif">Tables in charts 2,4 and 5 shall be
filled in the attached spreadsheets (1 per Area and within the file one
per WG) and cut / paste (as picture) them into the powerpoint presentation.</font>
<br><font size=2 face="sans-serif">As I am aware of the reluctance to do
this from scratch, I have prepared in 2 hours the files per Area. Filling
the tables will need not more than 15'-30'  minutes per WG</font>
<br>
<br>
<br>
<br><font size=2 face="sans-serif"><b><u>How to use the template for a
WG Report: SEA SEC WG as an example</u></b></font>
<ol>
<li value=1><font size=2 face="sans-serif">Chart # 1:  replace [bracketed
text] with the WG info</font>
<li value=2><font size=2 face="sans-serif">Chart # 2: (maximum 2 charts)</font>
<ul>
<li><font size=2 face="sans-serif">Replace [bracketed text] with the WG
info</font>
<li><font size=2 face="sans-serif">Fill the table shown in the spread-sheet
"SEA SEC"of the SEA Area excel file the fields "status",
"" Start and / or Target Publication Date" and "Comments"</font>
<li><font size=2 face="sans-serif">Cut and paste the table (as picture)
in the power point presentation</font></ul>
<li value=3><font size=2 face="sans-serif">Chart # 3: free text to address
additional details for the Area info</font>
<li value=4><font size=2 face="sans-serif">Chart # 4: </font>
<ul>
<li><font size=2 face="sans-serif">If no Resources issues for Approved
Projects, keep the chart, delete the table and state "N/A". </font>
<li><font size=2 face="sans-serif">If the WG is missing prototype 2 resources,
use the spread-sheet "Approved Projects miss resources" of the
SEA Area excel file. Fill all the fields, in particular the resources estimated
in 2017,2018, 2019</font>
<li><font size=2 face="sans-serif">Cut and paste the table (as picture)
in the power point presentation</font></ul>
<li value=5><font size=2 face="sans-serif">Chart # 5</font>
<ul>
<li><font size=2 face="sans-serif">If no New Work Item (NWI) (i.e. a new
Project or an existing Draft Project) will be submitted during the next
6 months to the CMC for approval,  keep the chart, delete the table
and state "N/A".</font>
<li><font size=2 face="sans-serif">If NWI will be submitted during the
next 6 months to the CMC for approval,  use the spread-sheet "Forthcoming
Projects" of the SEA Area excel file. Fill all the fields, in particular
the resources estimated in 2017,2018, 2019</font>
<li><font size=2 face="sans-serif">Cut and paste the table (as picture)
in the power point presentation</font></ul></ol><font size=2 face="sans-serif">You
AD / DAD will use your charts to compile the Area report</font>
<br><font size=2 face="sans-serif">==========================================================</font>
<br><font size=2 face="sans-serif"><b><u>Area Directors</u></b></font>
<br><font size=2 face="sans-serif">Please use the attached template for
your report to the CESG</font>
<br>
<br><font size=2 face="sans-serif"><b><u>How to use the template for an
Area report: MOIMS Area as an example</u></b></font>
<ol>
<li value=1><font size=2 face="sans-serif">Chart # 1:  replace [bracketed
text] with the Area info</font>
<li value=2><font size=2 face="sans-serif">Chart # 2: Cut and paste the
excel file provided by the Secretariat</font>
<li value=3><font size=2 face="sans-serif">Chart # 3: Complete the Area
Executive Summary</font>
<li value=4><font size=2 face="sans-serif">Chart # 4: Include all WG Executive
Summary charts (maximum 2 charts / WG)</font>
<li value=5><font size=2 face="sans-serif">Chart # 5: Cut and paste (as
picture) the planning tables included in the WG Executive Summary (1 per
WG)</font>
<li value=6><font size=2 face="sans-serif">Chart # 6:  Compile the
spread sheet " "Approved Projects miss resources" with the
WG inputs  (i.e. NAV and SM&C WGs missing proto 2 resources).
Cut and paste (as picture) from the excel table to the powerpoint presentation</font>
<li value=7><font size=2 face="sans-serif">Chart #7: Compile the spread
sheet "Forthcoming Projects" with the WG inputs. Cut and paste
(as picture) from the excel table to the powerpoint presentation</font>
<li value=8><font size=2 face="sans-serif">Chart #8: Complete the "Resolution
Summary" replacing bracketed text</font>
<li value=9><font size=2 face="sans-serif">Chart #9: Complete the "issues
for CESG / CMC summary"  replacing bracketed text</font></ol><font size=2 face="sans-serif">==========================================================</font>
<br>
<br><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>