<font size=2 face="sans-serif">Dear all,</font>
<br><font size=2 face="sans-serif">Please find below the notes of the CESG
2016 webex # 1</font>
<br><font size=2 face="sans-serif">ciao</font>
<br><font size=2 face="sans-serif">nestor</font>
<br><font size=2 face="sans-serif">===================================================</font>
<ul>
<li><font size=3 face="sans-serif"><b>Actions status</b></font>
<ol>
<li value=1><font size=3 face="sans-serif"><b>CMC-A-2015-11-02</b> SANA
was requested to circulate a list, by agency, of the SCIDs that should
be returned to SANA. CMC member agencies should provide a response to SANA
by 31 January 2016.   </font><font size=3 color=red face="sans-serif">List
circulated. Expecting responses from all Agencies</font>
<li value=2><font size=3 face="sans-serif"><b>CMC-A-2015-11-03</b> The
CMC instructed the SE AD to create a resolution as a result of a CMC poll
that would inform the agencies that SANA plans to take back the simulator
IDs assigned to them  Action: Peter Shames </font><font size=3 color=red face="sans-serif"> CLOSED</font>
<li value=3><font size=3 face="sans-serif"><b>CMC-A-2015-11-10</b> The
CESG chair was instructed to clarify the Time Transfer, Clock Correlation,
and Time Synchronization projects from the ICPA/IOAG presentation. Action
Nestor Peccia   </font><font size=3 color=red face="sans-serif">CLOSED</font></ol>
<li><font size=3 face="sans-serif"><b>Document queue status</b></font>
<ol>
<li value=1><font size=3 face="sans-serif">2 SEC WG GB need a poll to be
silverised. </font><font size=3 color=red face="sans-serif">Poll issued</font>
<li value=2><font size=3 face="sans-serif">CCSDS 766.2-R-0, Voice and Audio
Communications (Proposed Red Book for Agency Review) </font><font size=3 color=red face="sans-serif">Poll
issued</font>
<li value=3><font size=3 face="sans-serif">CCSDS 911.1-B-3.1, Space Link
Extension—Return All Frames Service Specification (Draft Blue Book) </font><font size=3 color=red face="sans-serif">Poll
to be issued soon</font>
<li value=4><font size=3 face="sans-serif">CCSDS 911.2-B-2.1, Space Link
Extension—Return Channel Frames Service Specification (Draft Blue Book)
</font><font size=3 color=red face="sans-serif">Poll to be issued soon</font>
<li value=5><font size=3 face="sans-serif">CCSDS 911.5-B-2.1, Space Link
Extension—Return Operational Control Fields Service Specification (Draft
Blue Book) </font><font size=3 color=red face="sans-serif">Poll to be issued
soon</font>
<li value=6><font size=3 face="sans-serif">CCSDS 912.1-B-3.1, Space Link
Extension—Forward CLTU Service Specification (Draft Blue Book) </font><font size=3 color=red face="sans-serif">Poll
to be issued soon</font>
<li value=7><font size=3 face="sans-serif">CCSDS 912.3-B-2.1, Space Link
Extension—Forward Space Packet Service Specification (Draft Blue Book)
</font><font size=3 color=red face="sans-serif">Poll to be issued soon</font>
<li value=8><font size=3 face="sans-serif">CCSDS 130.12-G-0, CCSDS Protocols
over DVB-S2—Summary of Definition, Implementation and Performance (Draft
Green Book) </font><font size=3 color=red face="sans-serif">It will be
ready by end Feb 2016</font>
<li value=9><font size=3 face="sans-serif">CCSDS 651.2-G-0, Producer-Archive
Interface Specification (PAIS)—A Tutorial (Draft Green Book) </font><font size=3 color=red face="sans-serif">To
be done once the books mentioned above are completed</font><font size=3 face="sans-serif">
</font>
<li value=10><font size=3 face="sans-serif">CCSDS 902.1-B-0, Simple Schedule
Format Specification (Draft Blue Book) </font><font size=3 color=red face="sans-serif">PS/EB
will update the book together with SANA</font>
<li value=11><font size=3 face="sans-serif">CCSDS 727.0-B-4.1, CCSDS File
Delivery Protocol (CFDP) (Draft Blue Book) Interoperability Testing </font><font size=3 color=red face="sans-serif">Waiting
for ESA Proto activity</font>
<li value=12><font size=3 face="sans-serif">CCSDS 313.0-Y-1.1, Space Assigned
Numbers Authority (SANA)—Role, Responsibilities, Policies, and Procedures
(Draft Yellow Book) </font><font size=3 color=red face="sans-serif">waiting
for conditions to be solved</font>
<li value=13><font size=3 face="sans-serif">CCSDS 313.1-Y-0.1, CCSDS SANA
Registry Management Policy (Draft Yellow Book) </font><font size=3 color=red face="sans-serif">waiting
for conditions to be solved</font>
<li value=14><font size=3 face="sans-serif">CCSDS 313.2-Y-0, Procedures
for SANA Registry Specification (Draft Yellow Book) </font><font size=3 color=red face="sans-serif">waiting
for conditions to be solved</font></ol>
<li><font size=3 face="sans-serif"><b>Polls with conditions not yet resolved
</b></font>
<ol>
<li value=1><font size=3 face="sans-serif">PS is handling the conditions
raised during the poll for the 3 SANA books. ADs/DADs will receive soon
PS' proposal to solve them</font>
<li value=2><font size=3 face="sans-serif">MS / RB have prepared the response
to solve the conditions set for the creation of the Sub-NW WG</font></ol>
<li><font size=3 face="sans-serif"><b>Update of on-line Strategic Plan
/ charters / Approved-Draft Project</b></font>
<ul>
<li><font size=3 face="sans-serif">SEA status</font>
<br><font size=3 face="sans-serif">Done</font>
<li><font size=3 face="sans-serif">MOIMS status</font>
<br><font size=3 face="sans-serif">Mario has delivered a file with all
details. Missing DAI / Tel / CCSDS Secretariat updates</font>
<li><font size=3 face="sans-serif">CSS status</font>
<br><font size=3 face="sans-serif">Completed</font>
<li><font size=3 face="sans-serif">SLS status</font>
<br><font size=3 face="sans-serif">Done with the exception of Opt WG updates</font>
<li><font size=3 face="sans-serif">SOIS status</font>
<br><font size=3 face="sans-serif">Done </font>
<li><font size=3 face="sans-serif">SIS status</font>
<br><font size=3 face="sans-serif">Done</font></ul>
<li><font size=3 face="sans-serif"><b>Project Resource Table</b></font>
<br><font size=3 face="sans-serif">CMC is still working on action to deploy
resources for Proto 2 in 2016 and 2017</font>
<br><font size=3 face="sans-serif">Three new Projects were submitted for
CMC approval. Resources are granted</font>
<li><font size=3 face="sans-serif"><b>CWE Projects behind schedule</b></font>
<br><font size=3 face="sans-serif">Several Projects are behind schedule.
ADs to instruct WG chairs to update them</font>
<li><font size=3 face="sans-serif"><b>ICPA</b></font>
<br><font size=3 face="sans-serif">IOAG is working on the Catalogue 1 update.
NP to ask IOAG to deliver latest updates before Cleveland</font>
<li><font size=3 face="sans-serif"><b>Status of the IOAG comm assets in
the SANA registry </b></font>
<br><font size=3 face="sans-serif">Nobody is doing quality control. Each
Agency is responsible for the quality of their owned data. </font>
<br><font size=3 face="sans-serif">PS to send a list of known inconsistencies
to NP to be addressed to IOAG</font>
<li><font size=3 face="sans-serif"><b>Proc & Org YB modifications </b></font>
<br><font size=3 face="sans-serif">YB update has passed CESG ballot. CMC
poll is in progress.</font>
<li><font size=3 face="sans-serif"><b>Next CESG webex </b></font>
<br><font size=3 face="sans-serif">16th march 17:00 hrs CET</font>
<li><font size=3 face="sans-serif"><b>AOB</b></font>
<ol>
<li value=1><font size=3 face="sans-serif"><b>Secretary Cost: </b>NASA
has addressed to the CMC its problem to fully fund the Secretariat cost
from fiscal year 2017. Breakdown of the costs have been requested and NASA
will deliver them 3 weeks prior to the meeting in Brazil</font>
<li value=2><font size=3 face="sans-serif"><b>SOIS AD stepping down </b>Martin
Suess is changing position within ESA/ESTEC and CCSDS tasks are not within
the ToR of his future work. He will not participate in Cleveland and Rick
will deputise for him. A new AD will have to be nominated by the CMC.</font></ol></ul>
<br>
<br><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>