<font size=2 face="sans-serif">Dear all,</font>
<br>
<br><font size=2 face="sans-serif">After having included the majority of
the Draft Projects in the CWE, we are ready for the steps 2A and 2B</font>
<br>
<ul>
<li><font size=3 color=red face="sans-serif"><u>Step 2A for ADs / DADs</u></font></ul>
<br><font size=2 face="sans-serif">Please </font>
<ol>
<li value=1><font size=2 face="sans-serif">review your Area contents (Area
content tab)and goals in the CWE on-line strategic plan</font>
<li value=2><font size=2 face="sans-serif">check (CWE on-line strategic
Plan - Area links tab ) that all your existing informational reports, recommended
standards and practices are aligned with your Area approved projects. Add
the ones missing</font>
<li value=3><font size=2 face="sans-serif">check (CWE on-line strategic
Plan -  Area links tab) that all your future projects are aligned
with your Area approved Projects. Add the ones missing</font></ol>
<br><font size=3 color=blue face="sans-serif"><b>Due date for the Area
updates is 31st July 2015</b></font>
<br>
<ul>
<li><font size=3 color=red face="sans-serif"><u>Step 2B for WG Chairs /
WG deputy Chairs</u></font></ul>
<br><font size=2 face="sans-serif">Please </font>
<ol>
<li value=1><font size=2 face="sans-serif">review your WG Charter and align
it wrt the on-line Strategic Plan </font></ol>
<br><font size=3 color=blue face="sans-serif"><b>Due date for the charter
updates is 31st August 2015</b></font>
<br>
<br><font size=3 color=#008000 face="sans-serif"><b>@ Brian: Please can
you re-distribute the instruction of how to update the Area contents and
pointers ?.</b></font>
<br>
<br><font size=3 color=#ff00ff face="sans-serif"><b><u>@ CMC:</u></b></font>
<br><font size=2 face="sans-serif">I suggest that all Charter's update
are approved in one go, once the CESG gives the go-ahead. I assume that
we can do it by mid Sept 2015. This will give us 1.5 months prior to the
meeting in Darmstadt for review and re-alignment.</font>
<br><font size=2 face="sans-serif">Half day during the next joint CESG
/ CMC meeting will be dedicated to on-line strategic plan, long term plan,
short / medium term issues wrt resources and schedule</font>
<br>
<br><font size=2 face="sans-serif">ciao</font>
<br><font size=2 face="sans-serif">nestor</font><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>