<font size=2 face="sans-serif">Dear Nestor,</font>
<br>
<br><font size=2 face="sans-serif">before answering your questions, I need
you to remember that CCSDS BB 401 is a collection of very many independent
recommendations. As such the project for the evolution of such document
contains a number of related sub-projects (16 actually). Therefore, the
answer to your "Future Work" questions 1,2, 4 and 5 is that they
are included in the 401 update project and are realistic at this stage.
Question 3 is outside the purview of the WG.</font>
<br>
<br><font size=2 face="sans-serif">Concerning your BB/GB questions 1-3,
the schedule is in line with the current activity and is planned to be
reviewed at the end of the London meeting, as customary. Note that the
two GB projects are necessary since not covered by changes in 401 (BB).</font>
<br>
<br><font size=2 face="sans-serif">Last but not least, the current plan
stops in 2017 but may be changed in light of schedule delays or newly required
activities (one Agency already mentioned verbally a possible additional
study area.) If all the goals are achieved, the WG will of course be disbanded
as per CCSDS rules.</font>
<br>
<br><font size=2 face="sans-serif">Hope everything is clear now.</font>
<br>
<br><font size=2 face="sans-serif">Best Regards, Enrico</font>
<br>
<br>
<br>
<br><font size=1 color=#5f5f5f face="sans-serif">From:      
 </font><font size=1 face="sans-serif">Nestor Peccia/esoc/ESA</font>
<br><font size=1 color=#5f5f5f face="sans-serif">To:      
 </font><font size=1 face="sans-serif">Gian Paolo Calzolari/esoc/ESA@ESA,
"Moury Gilles" <Gilles.Moury@cnes.fr>, Enrico Vassallo/esoc/ESA@ESA,
Massimo Bertinelli/estec/ESA@ESA, Aaron.B.Kiely@jpl.nasa.gov, "Kazz,
Greg J \(313B\)" <greg.j.kazz@jpl.nasa.gov>, Klaus-Juergen Schulz/esoc/ESA@ESA,
Bernard.L.Edwards@nasa.gov</font>
<br><font size=1 color=#5f5f5f face="sans-serif">Cc:      
 </font><font size=1 face="sans-serif">cesg@mailman.ccsds.org,
cmc-bounces@mailman.ccsds.org</font>
<br><font size=1 color=#5f5f5f face="sans-serif">Date:      
 </font><font size=1 face="sans-serif">03/11/2014 10:16</font>
<br><font size=1 color=#5f5f5f face="sans-serif">Subject:    
   </font><font size=1 face="sans-serif">SLS Area: Goals
/ Project Checks needed in the WGs</font>
<br>
<hr noshade>
<br>
<br><font size=2 face="sans-serif">Dear all,</font>
<br>
<br><font size=2 face="sans-serif">As the CESG and CMC will review the
current Strategic Plan during our planned joint meeting at London, it is
recommended to</font>
<ul>
<li><font size=2 face="sans-serif">check the Area goals and update if needed
(</font><a href=http://cwe.ccsds.org/fm/sp/default.aspx><font size=3 color=blue><u>http://cwe.ccsds.org/fm/sp/default.aspx</u></font></a><font size=2 face="sans-serif">)</font>
<li><font size=2 face="sans-serif">check the links wrt published books
and update if needed (</font><a href=http://cwe.ccsds.org/fm/sp/default.aspx><font size=3 color=blue><u>http://cwe.ccsds.org/fm/sp/default.aspx</u></font></a><font size=2 face="sans-serif">)</font>
<li><font size=2 face="sans-serif">cross check the schedule of our current
books under production and update if needed</font>
<li><font size=2 face="sans-serif">include the future work as CWE Projects
with a start date (realistic please) in the future </font></ul>
<br><font size=2 face="sans-serif">ADs have edit permission to the CWE
Strategic Plan (</font><a href=http://cwe.ccsds.org/fm/sp/default.aspx><font size=3 color=blue><u>http://cwe.ccsds.org/fm/sp/default.aspx</u></font></a><font size=2 face="sans-serif">),
and they shall check (co-ordinating with the related WG Chair) and update</font>
<br><font size=2 face="sans-serif">in particular</font>
<br>
<br><font size=2 face="sans-serif"><b><u>RFM WG</u></b></font>
<ol>
<li value=1><font size=2 face="sans-serif">Evolution of RFM recommendations
BB        </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date ?</font>
<li value=2><font size=2 face="sans-serif">Planetary Communications System
GB        </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date ?</font>
<li value=3><font size=2 face="sans-serif">GMSK Telemetry and PN Ranging
GB                </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font></ol>
<br><font size=2 face="sans-serif">Future Work</font>
<ol>
<li value=1><font size=2 face="sans-serif">RFM Part 1 with modulation scheme
for 26 Ghz</font><font size=2 color=red face="sans-serif">    
   Include Project in CWE with realistic start date in
the future (resources?)</font>
<li value=2><font size=2 face="sans-serif">RFM Part 1 with high rate TM
and ranging</font><font size=2 color=red face="sans-serif">    
            Include Project
in CWE with realistic start date in the future (resources?)</font>
<li value=3><font size=2 face="sans-serif">Prox 1 SLP 5 yr review</font><font size=2 color=red face="sans-serif">
               
               Include
Project in CWE with realistic start date in the future (resources?)</font>
<li value=4><font size=2 face="sans-serif">RFM Part 1 with MPSA</font><font size=2 color=red face="sans-serif">
               
               Include
Project in CWE with realistic start date in the future (resources?)</font>
<li value=5><font size=2 face="sans-serif">RFM Part 1with higher order
modulations</font><font size=2 color=red face="sans-serif">    
           Include Project
in CWE with realistic start date in the future (resources?)</font></ol><font size=2 face="sans-serif">No
more standards foreseen after 2017        
       </font><font size=2 color=red face="sans-serif">
       Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font>
<br>
<br><font size=2 face="sans-serif"><b><u>C&S WG</u></b>    
               
   </font><font size=2 color=red face="sans-serif">  
             </font>
<ol>
<li value=1><font size=2 face="sans-serif">Next Generation Uplink Coding
 BB                </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date ?</font>
<li value=2><font size=2 face="sans-serif">Short (64, 128, 256 bit ) LDPC
codes for uplink   OB        </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<li value=3><font size=2 face="sans-serif">TM Channel Coding for DVB-S2,
GB                </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date ?</font>
<li value=4><font size=2 face="sans-serif">TM Channel Coding for SCCC,
GB</font><font size=2 color=red face="sans-serif">      
               
 Is Schedule realistic ? If not, include new estimated completion
date ?</font>
<li value=5><font size=2 face="sans-serif">Update TM channel coding with
LDPC slicing  BB        </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<li value=6><font size=2 face="sans-serif">VCM Systems for CCSDS  
MB                </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date ?</font></ol>
<br><font size=2 face="sans-serif">Future Work</font>
<ol>
<li value=1><font size=2 face="sans-serif">ACM Systems for CCSDS MB  
             </font><font size=2 color=red face="sans-serif">
       Include Project in CWE with realistic
start date in the future (resources?)</font>
<li value=2><font size=2 face="sans-serif">Erasure Coorecting codes for
low SN ratio BB        </font><font size=2 color=red face="sans-serif">Include
Project in CWE with realistic start date in the future (resources?)</font></ol>
<br><font size=2 face="sans-serif"> <b><u>MHDC WG</u></b></font>
<ol>
<li value=1><font size=2 face="sans-serif"> Image Data Compression,
Issue 2  BB        </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date (resources?)?</font>
<li value=2><font size=2 face="sans-serif">Lossless MHIC GB    
               
            </font><font size=2 color=red face="sans-serif"> 
      Is Schedule realistic ? If not, include new
estimated completion date (resources?)?</font>
<li value=3><font size=2 face="sans-serif">Spectral Pre-Processing Transform
for MHIC BB        </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date (resources?)?</font></ol><font size=2 face="sans-serif">No
more standards foreseen after 2016        
       </font><font size=2 color=red face="sans-serif">
       Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font>
<br>
<br><font size=2 color=red face="sans-serif"> </font><font size=2 face="sans-serif"><b>SLP
WG</b></font>
<ol>
<li value=1><font size=2 face="sans-serif">AOS SDLP 5-year Review + SDLS
Rqmt  BB        </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date (resources?)?</font>
<li value=2><font size=2 face="sans-serif">Next Generation SDLP BB  
      </font><font size=2 color=red face="sans-serif"> 
               
      Insert realistic start date in the future
(resources?)</font>
<li value=3><font size=2 face="sans-serif">Next Generation SDLP GB  
               
     </font><font size=2 color=red face="sans-serif">
       Insert realistic start date in the future
(resources?)</font>
<li value=4><font size=2 face="sans-serif">SDLP GB      
               
               
 </font><font size=2 color=red face="sans-serif">    
   Insert realistic start date in the future (resources?)</font>
<li value=5><font size=2 face="sans-serif">TC SDLP Issue 3: SDLS Rqmt  BB
               </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date (resources?)?</font>
<li value=6><font size=2 face="sans-serif">TM SDLPl 5-year Review + SDLS
Rqmt  BB        </font><font size=2 color=red face="sans-serif">
       Is Schedule realistic ? If not, include
new estimated completion date (resources?)?</font></ol>
<br><font size=2 face="sans-serif">Future Work</font>
<ol>
<li value=1><font size=2 face="sans-serif">Prox-1 SLP Data Link Layer 5
yr review BB                </font><font size=2 color=red face="sans-serif">Include
Project in CWE with realistic start date in the future (resources?)</font></ol><font size=2 face="sans-serif">No
more standards foreseen after 2018        
       </font><font size=2 color=red face="sans-serif">
       Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font>
<br><font size=2 face="sans-serif"> </font>
<br><font size=2 face="sans-serif"><b>SDL Security WG</b></font>
<ol>
<li value=1><font size=2 face="sans-serif">SDL Security (SDLS) extended
procedures  BB        </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<li value=2><font size=2 face="sans-serif">SDL Security Ops Concept Issue
1 GB                </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<li value=3><font size=2 face="sans-serif">SDL Security Ops Concept  Issue
2  GB                </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<li value=4><font size=2 face="sans-serif">SDL Security Protocol  BB
                 
              </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font></ol><font size=2 face="sans-serif">No
more standards foreseen after 2017        
       </font><font size=2 color=red face="sans-serif">
       Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font><font size=2 face="sans-serif">  
               
     </font>
<br>
<br><font size=2 face="sans-serif"><b>Optical WG</b></font>
<br><font size=2 face="sans-serif">Coding & Synchronization  BB
               
               </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<br><font size=2 face="sans-serif">Concepts and Terminologies  GB
               
       </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font><font size=2 face="sans-serif">
</font>
<br><font size=2 face="sans-serif">Physical Layer  BB    
               
               
   </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<br><font size=2 face="sans-serif">RT Weather and Atmospheric Characteriz.
Data  GB        </font><font size=2 color=red face="sans-serif">Is
Schedule realistic ? If not, include new estimated completion date ?</font>
<br><font size=2 face="sans-serif">No more standards foreseen after 2018
               </font><font size=2 color=red face="sans-serif">
       Goals achieved ? WG to be disbanded
? or Schedule to be adapted ?</font>
<br>
<br><font size=2 face="sans-serif">ciao</font>
<br><font size=2 face="sans-serif">nestor</font>
<br><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>