<font size=2 face="sans-serif">Dear Nestor,</font>
<br><font size=2 face="sans-serif">        your
main question is "</font><font size=2 color=red face="sans-serif"><b>to
determine if the delayed projects should be closed or remain open</b></font><font size=2 face="sans-serif">"
and I confirm that all those SLS project listed below SHALL remain open.</font>
<br>
<br><font size=2 face="sans-serif">As additional comment I can say that
often Green Book suffer of the low priority and have to stay long time
in the queue for polls and publication.</font>
<br><font size=2 face="sans-serif">At the bottom of this mail you also
find a specific input by RFM WG.and MHDC WG.</font>
<br>
<br><font size=2 face="sans-serif">Best Regards</font>
<br>
<br><font size=2 face="sans-serif">Gian Paolo</font>
<br>
<br><img src=cid:_1_0C9015D80C900FEC002C872EC1257FD2 style="border:0px solid;">
<br>
<br><font size=2 face="sans-serif">--------------------------------------------------------------</font>
<br><font size=2 face="sans-serif">Dear SLS AD and DAD,</font>
<br>
<br><font size=2 face="sans-serif">concerning the  "</font><font size=3 face="Calibri">Evolutions
of CCSDS recommendations for RF & Modulation 5.01 RF and Modulation
Working Group Blue"</font><font size=2 face="sans-serif"> indicated
to have a 36 months delay, there is a basic interpretation problem.</font>
<br>
<br><img src=cid:_1_0C91B9CC0C91B760002C872EC1257FD2 style="border:0px solid;">
<br>
<br><font size=2 face="sans-serif">This project calls mainly for updating
document CCSDS 401 BB that, as you know well, is a collection of currently
109 individual self-standing recommendations. From 2008 until now, new
items have been added to the project almost every year resulting in an
overall shift of the project completion date. For instance, the impact
of NGU requirements on existing telecommand recommendations, the inclusion
of ACM/VCM jointly developed with the C&S WG as additional recommendation,
or the alignment of the 8 GHz Earth exploration recommendation with the
new 26 GHz recommendation were not included in the first version of the
project.</font>
<br><font size=2 face="sans-serif">While some delay with some of the items
is present and has been properly flagged at each meeting via the SLS area
report (for instance with emergency communication, MSPA, 22 GHz modulations),
the main cause of the ECD-DA change is the addition of new items to the
project.</font>
<br>
<br><font size=2 face="sans-serif">Later this year,  the WG will ask
for including a revision of the DDOR recommendation and a new ranging technique
(telemetry ranging) to the project. These requests, if accepted by CMC,
will further delay the overall completion date as resources are normally
not increased..</font>
<br>
<br><font size=2 face="sans-serif">Additionally, this project is indicated
as the one with the second longest delay (36 months.) However, the delay
has to be scaled to the estimated duration: for instance 36/109 is about
33% whereas other projects that are ranked better have ratios like 24/46
or 52%, etc..... I believe that the worst case is the project with 29/16
that corresponds to 55%.</font>
<br>
<br><font size=2 face="sans-serif">I trust you can convey the message to
treat this special project differently from the others to the CMC. Splitting
the project in 109+ individual projects just for showing that most of them
are on time is not considered a good way forward.</font>
<br>
<br><font size=2 face="sans-serif">Best Regards, Enrico</font>
<br><font size=2 face="sans-serif">-----------------------------------------------------------</font>
<br><font size=3>The two items listed for MHDC are (a) Issue 2 of CCSDS-122.0-B
and (b) CCSDS-122.0-B.</font>
<br>
<br><font size=3>For (a): we already have a resolution requesting promotion
to Red Book and agency review.</font>
<br><font size=3>For (b): we are in the final stages of edits and we expect
to request promotion to Red Book probably near the end of this month.</font>
<br>
<br><font size=3>So my recommendation is to keep both projects open.</font>
<br>
<br><font size=3>Aaron</font>
<br><PRE>This message and any attachments are intended for the use of the addressee or addressees only.
The unauthorised disclosure, use, dissemination or copying (either in whole or in part) of its
content is not permitted.
If you received this message in error, please notify the sender and delete it from your system.
Emails can be altered and their integrity cannot be guaranteed by the sender.

Please consider the environment before printing this email.
</PRE>