<html>
<body>
<font size=3>All,<br><br>
August 24, 2015 marks the 4-week deadline of the Cambridge, MA Technical
Meeting.<br><br>
<b>Besides the August 243 submission listed below, draft RFPs, draft
RFIs, and proposed RFCs are due 4 weeks prior to the September TC
meeting.<br><br>
</b>Proposed RFC's must be accompanied by a cover letter as well as a
Letter of Intent or Letters of Intent.<br><br>
Please let me know if you seek extensions for any of the processes
below...and reserve your document numbers early<br><br>
Thanks a lot in advance<br><br>
-Juergen<br><br>
<br>
<a href="http://www.omg.org/techprocess/meetings/schedule/FSM4RTC_1_0_FTF.html">
Finite State Machine Component for RTC (FSM4RTC) 1.0 FTF</a> (FTF Report
Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/GRA-UML_1.0_FTF.html">
GRA-UML 1.0 FTF</a> (FTF Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/DAF-FTF.html">
Dependability Assurance Framework for Safety-Sensitive Consumer Devices
(DAF) 1.0 FTF</a> (FTF Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/Web-enabled_DDS_1.0_FTF_2.html">
Web-enabled DDS 1.0 FTF 2</a> (FTF Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/ASCSM-FTF.html">
Automated Source Code Security Measure (ASCSM) 1.0 FTF</a> (FTF Report
Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/DDS-RPC.html">
RPC over DDS 1.0 FTF</a> (FTF comments due) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/OARIS_1.0_FTF.html">
OARIS 1.0 FTF</a> (FTF report due date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/FIBO_Business_Entities_1.0_FTF_2.html">
FIBO Business Entities 1.0 FTF 2</a> (FTF report due date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/API4KB.html">
Application Programming Interfaces (API) to Knowledge Bases (KB) RFP</a>
(Initial Submission Deadline) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/RIA_Dynamic_Component_Model_RFP.html">
RIA Dynamic Component Model RFP</a> (Initial Submission Deadline) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/Object_Constraint_Language_2.5_RFP.html">
Object Constraint Language 2.5 RFP</a> (Initial Submission Deadline)
<br>
<a href="http://www.omg.org/techprocess/meetings/schedule/ODM_1.2_RTF.html">
Ontology Definition Metamodel (ODM) 1.2 RTF</a> (RTF Report Due Date)
<br>
<a href="http://www.omg.org/techprocess/meetings/schedule/CTS2-RTF.html">
Common Terminology Services 2 (CTS2) 1.3 Revision Task Force</a> (RTF
Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/CMMN_1.1_RTF.html">
CMMN 1.1 RTF</a> (RTF Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/SPMS_1_1_RTF.html">
Structured Patterns Metamodel Standard (SPMS) 1.1 RTF</a> (RTF Report Due
Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/FIBO_Foundations_1.1_RTF.html">
FIBO Foundations 1.1 RTF</a> (RTF Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/DTV_13_RTF.html">
DateTime Vocabulary (DTV) 1.3 RTF</a> (RTF Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/MDMI_1.1_RTF.html">
MDMI 1.1 RTF</a> (RTF Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/UPDM_2.2_RTF.html">
UPDM 2.2 RTF</a> (RTF Report Due Date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/ADM_KDM_1.4_RTF.html">
ADM KDM 1.4 RTF</a> (RTF Report due date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/ALF-RTF.html">
Action Language for fUML 1.1 (ALF) RTF</a> (RTF report due date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/fUML_1.2_RTF.html">
fUML 1.2 RTF</a> (RTF report due date) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/ROIS_1.1_RTF.html">
Robotic Interaction Service Framework 1.1 RTF</a> (RTF report due date)
<br>
<a href="http://www.omg.org/techprocess/meetings/schedule/UCM_RFP.html">
Unified Component Model for Distributed, Real-Time and Embedded Systems
RFP</a> (Revised Submission Deadline) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/OntoIOp_RFP.html">
Ontology, Model and Specification Integration and Interoperability
(OntoIOp) RFP</a> (Revised Submission Deadline) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/IEF_Reference_Architecture_RFP.html">
IEF Reference Architecture RFP</a> (Revised Submission Deadline) <br>
<a href="http://www.omg.org/techprocess/meetings/schedule/ArchiMate_RFP.html">
UML® Profile for ArchiMate® and ArchiMate® Meta-model RFP</a> (Revised
Submission Deadline) </font></body>
<br>

<body>
<font size=3><br><br>
<br><br>
<br>
Juergen Boldt<br>
Director, Member Services<br>
Object Management Group<br>
109 Highland Ave<br>
Needham, MA 02494 USA<br><br>
Tel:  +1 (781) 444 0404 x 132<br>
fax:  +1 (781) 444 0320<br><br>
<a href="http://www.omg.org/" eudora="autourl">www.omg.org<br><br>
</a><a href="http://www.omg.org/signature.htm">
<img src="http://www.omg.org/images/signature.gif" width=150 height=89 alt="[]">
</a><br><br>
<br><br>
<br><br>
<br>
  </font></body>
</html>